Site Photographs |
 |
Labor Shed Making on 22-08-24 |
 |
Labour Shed Making on 22-08-24 |
|
|
 |
Sarker Management Visit on 26-08-24 |
 |
Steel Labour on 26-08-24 |
|
|
 |
Workshop Sheet Removing on 27-08-24 |
 |
Workshop Sheet Removing on 27-08-24 |
|
|
 |
Sheet removing on 28-08-24 |
 |
Sheet removing on 28-08-24 |
|
|
 |
Sheet removing on 29-08-24 |
 |
Sheet removing on 29-08-24 |
|
|
 |
Steel beam cutting on 30-08-24 |
 |
Steel beam removing on 30-08-24 |
|
|
 |
Fencing framing on 31-08-24 |
 |
Fencing framing on 31-08-24 |
|
|
 |
Outside beam removing on 1-09-24 |
 |
Inside fencing on 1-09-24 |
|
|
 |
Fencing work on 2-09-24 |
 |
Floor cutting on 2-09-24 |
|
|
 |
Brick wall dismantling on 3-09-24 |
 |
Brick wall dismatling on 3-09-24 |
|
|
 |
Pile Re-bar mobillized on 4-09-24 |
 |
Pile Equipment mobilized on 4-09-24 |
|
|
 |
Material shifting by crane on 5-09-24 |
 |
Pile re-bar mobilized on 5-09-24 |
|
|
 |
Steel Labour on 6-09-24 |
 |
Project Status on 6-09-24 |
|
|
 |
Floor and Foundation Removal on 7-09-24 |
 |
Pile Re-bar work on 7-09-24 |
|
|
 |
Floor,foundatn, road,tank cutting,removi on 8-09-24 |
 |
Piling equipment maintenance on 8-09-24 |
|
|
 |
Old short column found durring excavatio on 9-09-24 |
 |
Excavation for pile mud tank on 9-09-24 |
During excavation old pile found |
|
 |
Fencing after dismantling on 10-09-24 |
 |
Pile mud tank brick work on 10-09-24 |
|
|
 |
Ground breaking ceremony on 11-09-24 |
 |
Pile mud tank complete on 11-09-24 |
|
|
 |
Pile boring on 12-09-24 |
 |
Pile concreting on 12-09-24 |
|
|
 |
Pile cage length measuring on 13-09-24 |
 |
Pile concreting on 13-09-24 |
|
|
 |
Pile boring on 14-09-24 |
 |
Concrete cube for test on 14-09-24 |
|
|
 |
Pile boring on 15-09-24 |
 |
Concrete cylinder for test on 15-09-24 |
|
|
 |
Pile cage downing on 16-09-24 |
 |
Road washing after pile finishing on 16-09-24 |
|
|
 |
Pile boring length checking on 17-09-24 |
 |
Pile concreting on 17-09-24 |
|
|
 |
Pile reboring new location on 18-09-24 |
 |
Pile concreting on 18-09-24 |
Pile no.15, Grid 1B relocated to a new location |
Due to existence of old pile |
 |
Pile boring length checking on 19-09-24 |
 |
Pile boring chisel repairing on 19-09-24 |
|
|
 |
During boring old concrete-pipe found on 20-09-24 |
 |
After Concrete-pipe removal boring resta on 20-09-24 |
During boring pile no.35 grid-2B |
Old concrete-MS pipe found |
 |
During boring Obstacles found on 21-09-24 |
 |
Pile concreting on 21-09-24 |
During boring pile no.36, grid-2B |
Obstacles found |
 |
Pile boring length checking on 22-09-24 |
 |
Pile concreting on 22-09-24 |
|
|
 |
Rig shifting to Grid 1A on 23-09-24 |
 |
Chisel broken due to obstacle on 23-09-24 |
During boring pile no.18 grid-1A |
Chisel broken due to obstacles |
 |
Boring obstacle Old CC breaking on 24-09-24 |
 |
Pile-57 concreting completed on 24-09-24 |
During boring pile no.53, grid-3B |
Obstacle Old Concrete found |
 |
Pile cap re-bar dia checking on 25-09-24 |
 |
Due to electrical line 1.5 m excavation on 25-09-24 |
Due to live electric line Grid-3 |
Excavating all pile point upto 1.5 m |
 |
Pile cap re-bar dia checking on 26-09-24 |
 |
Bentonite received for pile boring on 26-09-24 |
|
|
 |
Excavating for pile boring obstacles on 27-09-24 |
 |
Making road for reading concrete truck on 27-09-24 |
|
|
 |
Pile boring depth checking on 28-09-24 |
 |
Piling rig shifting on 28-09-24 |
|
|
 |
Pile no.47 boring length checking on 29-09-24 |
 |
Piling rig setting on 29-09-24 |
Pile no.47 of grid 3C length 22m |
Total 6 piles 22 m |
 |
Piling rig shifting on 30-09-24 |
 |
Pile concreting on 30-09-24 |
All pile completed |
|
 |
Earth excavation on 1-10-24 |
 |
Re-bar straighting on 1-10-24 |
|
|
 |
Earth excavation on 2-10-24 |
 |
Old base-column found during excavation on 2-10-24 |
During excavating old foundation with column found |
In Grid-1 in between C and D |
 |
Obstacle RCC dismantling on 3-10-24 |
 |
Earth excavation on 3-10-24 |
Dismantling RCC foundation found during excavation |
Money and Time wastage |
 |
Pile Head breaking on 4-10-24 |
 |
Wooden pile driving on 4-10-24 |
Due to rain work stopped |
|
 |
Old base breaking on 5-10-24 |
 |
Earth excavation on 5-10-24 |
|
|
 |
Wooden shore pile driving on 6-10-24 |
 |
Earth Excavation on 6-10-24 |
|
|
 |
Earth excavation on 7-10-24 |
 |
Pile head breaking on 7-10-24 |
|
|
 |
Excavated earth dumping on 8-10-24 |
 |
Dismantling by hydraulic breaker on 8-10-24 |
Dismantling old foundation 17 m3 |
By Hydraulic hammer |
 |
Earth excavation on 9-10-24 |
 |
Old base dismantling by hydraulic hammer on 9-10-24 |
Old base dismantling 11 m3 by hydraulic hammer |
|
 |
Pile Load Test-PDA-Pile Development on 10-10-24 |
 |
Water Reservoir Base CC-Bottom on 10-10-24 |
Old base dismantling 4 m3 by hydraulic hammer |
|
 |
Dewatering on 11-10-24 |
 |
Pile head breaking on 11-10-24 |
|
|
 |
Checking before pile cap lean concreting on 12-10-24 |
 |
Pile cap lean concreting on 12-10-24 |
Due to rain work started late |
|
 |
Pile cap side brick shuttering on 13-10-24 |
 |
Earth excavation manually on 13-10-24 |
Wooden shore piling 14 nos. |
|
 |
Earth excavation on 14-10-24 |
 |
Shoring on 14-10-24 |
Wooden pile driving 41 nos. |
|
 |
Inspection before CC at -5200 mm on 15-10-24 |
 |
CC at level -5200 finished on 15-10-24 |
|
|
 |
Excavation, brick-shuttering, steel shut on 16-10-24 |
 |
Pile Cap Lean concreting on 16-10-24 |
|
|
 |
Pile head breaking on 17-10-24 |
 |
Water tank base brick wall shuttering on 17-10-24 |
|
|
 |
Pile head breaking on 18-10-24 |
 |
Pile cap lean concreting on 18-10-24 |
|
|
 |
Pile Cap Brick Shuttering on 19-10-24 |
 |
Pile Head Breaking on 19-10-24 |
|
|
 |
PIT (Pile Integrity) testing on 20-10-24 |
 |
Pile cap re-bar work on 20-10-24 |
|
|
 |
Pile cap concreting on 21-10-24 |
 |
Pile cap lean concreting on 21-10-24 |
|
|
 |
Tank base water proofing membrane SBS wo on 22-10-24 |
 |
Tank base top mortering on 22-10-24 |
|
|
 |
Machine foundation re-bar inspection on 23-10-24 |
 |
CC work on 23-10-24 |
|
|
 |
Tank base brick wall shuttering on 24-10-24 |
 |
Pile head breaking on 24-10-24 |
|
|
 |
PIT test on 25-10-24 |
 |
Pile cap concreting on 25-10-24 |
|
|
 |
Column re-bar work on 26-10-24 |
 |
Pile cap re-bar work on 26-10-24 |
|
|
 |
Pile cap re-bar work on 27-10-24 |
 |
Tank wall shuttering on 27-10-24 |
|
|
 |
Raft re-bar inspection before concreting on 28-10-24 |
 |
Raft concreting by Pump on 28-10-24 |
|
|
 |
Earth excavation on 29-10-24 |
 |
Raft re-bar work on 29-10-24 |
|
|
 |
PDA test performing on 30-10-24 |
 |
Raft re-bar work on 30-10-24 |
|
|
 |
Column Shuttering on 31-10-24 |
 |
Water proofing admixture adding in concr on 31-10-24 |
|
|
 |
Bracing beam- Column shuttering on 1-11-24 |
 |
Column concreting on 1-11-24 |
|
|
 |
Pile head breaking on 2-11-24 |
 |
Bracing beam concreting on 2-11-24 |
|
|
 |
Wall re-bar work on 3-11-24 |
 |
Pile cap concreting on 3-11-24 |
|
|
 |
Pile cap Concreting on 4-11-24 |
 |
Column concreting on 4-11-24 |
|
|
 |
Earth loading for backfilling on 5-11-24 |
 |
Column shuttering on 5-11-24 |
|
|
 |
Wall shuttering on 6-11-24 |
 |
on 6-11-24 |
|
Tank base concreting |
 |
Wall shuttering on 7-11-24 |
 |
Column re-bar work on 7-11-24 |
|
|
 |
Backfilling on 8-11-24 |
 |
Foundation beam rebar work on 8-11-24 |
|
|
 |
Wall shuttering on 9-11-24 |
 |
Foundation beam rebar inspection on 9-11-24 |
|
|
 |
Foundation beam rebar work on 10-11-24 |
 |
Wall concreting on 10-11-24 |
|
|
 |
Foundation beam shuttering on 11-11-24 |
 |
Foundation beam rebar work on 11-11-24 |
|
|
 |
Foundation beam inspection before concre on 12-11-24 |
 |
Foundation beam concreting on 12-11-24 |
|
|
 |
Anchor bolt setting on 13-11-24 |
 |
Foundation beam concreting on 13-11-24 |
|
|
 |
Wall shuttering on 14-11-24 |
 |
Wall shuttering on 14-11-24 |
|
|
 |
Wall shuttering on 15-11-24 |
 |
Foundation beam rebar work on 15-11-24 |
|
|
 |
Wall concreting on 16-11-24 |
 |
Foundation beam concreting on 16-11-24 |
|
|
 |
Foundation beam bottom shuttering on 17-11-24 |
 |
Foundation beam rebar work on 17-11-24 |
|
|
 |
Anchor bolt setting on 18-11-24 |
 |
Foundation beam concreting on 18-11-24 |
|
|
 |
Tank slab shuttering on 19-11-24 |
 |
Tank slab shuttering on 19-11-24 |
|
|
 |
Tank slab shuttering on 20-11-24 |
 |
Tank slab shuttering on 20-11-24 |
|
|
 |
Embedded steel parts mobilized on 21-11-24 |
 |
Tank slab shuttering on 21-11-24 |
|
|
 |
Tank slab shuttering on 22-11-24 |
 |
Tank wall water proofing membrain SBS fi on 22-11-24 |
|
|
 |
Tank wall stylo foam fixing on 23-11-24 |
 |
Tank slab re-bar fixing on 23-11-24 |
|
|
 |
Tank slab re-bar work on 24-11-24 |
 |
MS Angle Fixing on 24-11-24 |
|
|
 |
Tank Slab Re-bar work on 25-11-24 |
 |
Embedded steel part fixing on 25-11-24 |
|
|
 |
Unloading steel Column-beam on 26-11-24 |
 |
Tank slab concreting on 26-11-24 |
|
|
 |
Crane mobilized for Erection on 27-11-24 |
 |
Non- shrink Grouting on 27-11-24 |
|
|
 |
Steel column Erection on 28-11-24 |
 |
Tank slab re-bar fixing on 28-11-24 |
|
|
 |
Cork sheet fixing in Tank wall on 29-11-24 |
 |
Tank slab concreting on 29-11-24 |
|
|
 |
Loading sand for filling on 30-11-24 |
 |
Sand unloading on 30-11-24 |
|
|
 |
Sand filling work on 1-12-24 |
 |
Steel materials unloading on 1-12-24 |
|
|
 |
Steel materials unloading on 2-12-24 |
 |
Installing steel beam on 2-12-24 |
|
|
 |
Steel member size checking on 3-12-24 |
 |
Steel member installation on 3-12-24 |
|
|
 |
Steel materials unloading on 4-12-24 |
 |
Steel structure installation on 4-12-24 |
|
|
 |
Steel materials unloading on 5-12-24 |
 |
Steel structure installation on 5-12-24 |
|
|
 |
Steel structure installation on 6-12-24 |
 |
Steel structure installation on 6-12-24 |
|
|
 |
Steel structure installation on 7-12-24 |
 |
Steel structure installation on 7-12-24 |
|
|
 |
Steel structure installation on 8-12-24 |
 |
Steel column vertical alignment checking on 8-12-24 |
|
|
 |
Steel materials unloading on 9-12-24 |
 |
Steel structure installation on 9-12-24 |
|
|
 |
Steel structure installation on 10-12-24 |
 |
Steel structure welding on 10-12-24 |
|
|
 |
Steel structure installation on 11-12-24 |
 |
Nut tightening on 11-12-24 |
|
|
 |
Steel materials unloading on 12-12-24 |
 |
Steel structure installation on 12-12-24 |
|
|
 |
Client inspecting Steel structure instal on 13-12-24 |
 |
Steel structure wedding work on 13-12-24 |
|
|
 |
Sub-base work in floor on 14-12-24 |
 |
Steel structure installation on 14-12-24 |
|
|
 |
Floor slab re-bar work on 15-12-24 |
 |
Steel materials unloading on 15-12-24 |
|
|
 |
Re- bar inspection before concreting on 16-12-24 |
 |
Ground floor concreting on 16-12-24 |
|
|
 |
Steel structure installation on 17-12-24 |
 |
Steel member welding on 17-12-24 |
|
|
 |
Materials delivered on 18-12-24 |
 |
Sub-base work on 18-12-24 |
|
|
 |
Steel materials unloading on 19-12-24 |
 |
Steel structure installation on 19-12-24 |
|
|
 |
Steel materials unloading on 20-12-24 |
 |
Steel structure installation on 20-12-24 |
|
|
 |
Steel Structure installation on 21-12-24 |
 |
Ground Floor Concreting on 21-12-24 |
|
|
 |
Mechanical troweling on 22-12-24 |
 |
Steel structure installation on 22-12-24 |
|
|
 |
Steel structure installation on 23-12-24 |
 |
Welding work on 23-12-24 |
|
|
 |
Shear bolt fixing on decking slab on 24-12-24 |
 |
Re-bar fixing on decking slab on 24-12-24 |
|
|
 |
Re-bar work on Decking on 25-12-24 |
 |
Shear bolt fixing on decking slab on 25-12-24 |
|
|
 |
Steel structure erection at 4th floor on 26-12-24 |
 |
Concreting on Decking slab 7 on 26-12-24 |
5 |
|
 |
Steel structure installation on 27-12-24 |
 |
Level-2.5m : Checker plate fixing on 27-12-24 |
|
|
 |
Level-7.5 Checkered plate fixing on 28-12-24 |
 |
Steel structure welding on 28-12-24 |
|
|
 |
Steel structure installation on 29-12-24 |
 |
Checkered plate fixing on 29-12-24 |
|
|
 |
Steel Structure installation on 30-12-24 |
 |
Steel Structure Installation on 30-12-24 |
|
|
 |
Sub-base mechanical compaction on 31-12-24 |
 |
Polythene laying over sub-base on 31-12-24 |
|
|
 |
Ground Floor RCC Slab Concreting on 1-01-25 |
 |
Ground Floor RCC Slab Concreting on 1-01-25 |
|
|
 |
Ground Floor Concrete Mechanical Troweli on 2-01-25 |
 |
Decking Slab Fixing on 2-01-25 |
|
|
 |
Re-bar Work on Decking Slab on 3-01-25 |
 |
Stair Fixing on 3-01-25 |
|
|
 |
Re-bar fixing on Decking slab on 4-01-25 |
 |
Ground floor Concreting on 4-01-25 |
|
|
 |
Steel structure installation on 5-01-25 |
 |
Steel structure installation on 5-01-25 |
|
|
 |
Steel structure installation on 6-01-25 |
 |
Re-bar fixing on decking slab on 6-01-25 |
|
|
 |
Steel structure installation on 7-01-25 |
 |
Concreting on Decking Slab-7.5m on 7-01-25 |
|
|
 |
Column Joint working on 8-01-25 |
 |
Stair case installation on 8-01-25 |
|
|
 |
Steel structure installation on 9-01-25 |
 |
Stair Railing welding on 9-01-25 |
|
|
 |
Civil Labour on 10-01-25 |
 |
Steel Worker on 10-01-25 |
|
|
 |
Civil Labour on 11-01-25 |
 |
Steel Worker on 11-01-25 |
|
|
 |
Steel nut-blot tightening on 12-01-25 |
 |
Welding steel structure on 12-01-25 |
|
|
 |
Steel structure installation on 13-01-25 |
 |
Steel bracing installation on 13-01-25 |
|
|
 |
Checkered plate lifting on 14-01-25 |
 |
Checkered plate fixing on 14-01-25 |
|
|
 |
Checkered plate fixing on 15-01-25 |
 |
Checkered plate welding on 15-01-25 |
|
|
 |
Steel structure installation on 16-01-25 |
 |
Steel stair installation on 16-01-25 |
|
|
 |
Stair Fixing on 17-01-25 |
 |
Checkered plate welding on 17-01-25 |
|
|
 |
Stair landing checkered plate fixing on 18-01-25 |
 |
Checkered plate welding on 18-01-25 |
|
|
 |
Steel bracing fixing on 19-01-25 |
 |
Stair Railing fixing on 19-01-25 |
|
|
 |
Checkered plate fixing on 20-01-25 |
 |
Bracing fixing on 20-01-25 |
|
|
 |
5th Floor Steel Materials delivered on 21-01-25 |
 |
Stair Railing fixing on 21-01-25 |
|
|
 |
5th Floor Steel Materials delivered on 22-01-25 |
 |
AAC block delivered on 22-01-25 |
|
|
 |
AAC block work on 23-01-25 |
 |
Steel structure welding on 23-01-25 |
|
|
 |
Steel bracing fixing on 24-01-25 |
 |
AAC Block work on 24-01-25 |
|
|
 |
5th floor column installation on 25-01-25 |
 |
5th floor column installation on 25-01-25 |
|
|
 |
5th Floor Steel structure installation on 26-01-25 |
 |
Materials unloading on 26-01-25 |
|
|
 |
5th Floor Steel structure installation on 27-01-25 |
 |
Steel structure installation on 27-01-25 |
|
|
 |
5th Floor Steel structure installation on 28-01-25 |
 |
5th Floor Steel structure installation on 28-01-25 |
|
|
 |
5th Floor Steel structure installation on 29-01-25 |
 |
5th Floor Steel structure installation on 29-01-25 |
|
|
 |
Steel structure installation on 30-01-25 |
 |
Steel structure installation on 30-01-25 |
|
|
 |
5th Floor Steel structure installation on 31-01-25 |
 |
5th Floor Steel structure installation on 31-01-25 |
|
|
 |
Copping wood shuttering on 1-02-25 |
 |
5th Floor Steel structure installation on 1-02-25 |
|
|
 |
Steel structure installation on 2-02-25 |
 |
Steel structure installation on 2-02-25 |
|
|
 |
AAC block work on 3-02-25 |
 |
Steel structure installation on 3-02-25 |
|
|
 |
5th Floor roof decking slab mobilized on 4-02-25 |
 |
5th Floor Steel structure installation on 4-02-25 |
|
|
 |
5th Floor Roof Decking slab re-bar mobilized on 5-02-25 |
 |
Stair Railing fixing on 5-02-25 |
|
|
 |
5th Floor Steel structure installation on 6-02-25 |
 |
Stair Railing welding on 6-02-25 |
|
|
 |
5th Floor roof slab re-bar lifting on 7-02-25 |
 |
5th Floor roof slab decking sheet fixing on 7-02-25 |
|
|
 |
Stair Railing installation on 8-02-25 |
 |
5th Floor roof slab re-bar work on 8-02-25 |
|
|
 |
AAC block unloading on 9-02-25 |
 |
5th Floor roof slab re-bar inspection on 9-02-25 |
|
|
 |
5th Floor roof slab concreting on 10-02-25 |
 |
5th Floor roof slab concreting on 10-02-25 |
|
|
 |
5th Floor roof slab power trowel finishing on 11-02-25 |
 |
Stair Landing Checkerd Plate welding on 11-02-25 |
|
|
 |
Tool box meeting on 12-02-25 |
 |
Stair welding on 12-02-25 |
|
|
 |
Bracing welding on 13-02-25 |
 |
Stair Railing welding on 13-02-25 |
|
|
 |
New Hope Managements visit on 14-02-25 |
 |
Stair welding on 14-02-25 |
|
|
 |
AAC block work on 15-02-25 |
 |
Sag Rod fixing on 15-02-25 |
|
|
 |
Sag Rod fixing on 17-02-25 |
 |
Sag Rod fixing on 17-02-25 |
|
|
 |
Lintel concreting on 18-02-25 |
 |
Purlin fixing on 18-02-25 |
|
|
 |
AAC block work on 19-02-25 |
 |
Window frame fixing on 19-02-25 |
|
|
 |
AAC block work on 20-02-25 |
 |
Wall purlin fixing on 20-02-25 |
|
|
 |
AAC block work on 21-02-25 |
 |
Ground floor concreting on 21-02-25 |
|
|
 |
AAC block work on 22-02-25 |
 |
Wall purlin fixing on 22-02-25 |
|
|
 |
AAC block work on 23-02-25 |
 |
Checkered plate welding on 23-02-25 |
|
|
 |
Side sheeting work on 24-02-25 |
 |
Side Sheeting work on 24-02-25 |
|
|
 |
Roof top water proofing on 25-02-25 |
 |
Side Sheeting work on 25-02-25 |
|
|
 |
Fixing water proofing membrane on roof top on 26-02-25 |
 |
Wall sheeting on 26-02-25 |
|
|
 |
AAC block work on 27-02-25 |
 |
Steel work on 27-02-25 |
|
|
 |
AAC block work on 28-02-25 |
 |
Roof top water proofing membrane laying on 28-02-25 |
|
|
 |
AAC block work on 1-03-25 |
 |
Roof top water proofing membrane laying on 1-03-25 |
|
|
 |
Site sheeting on 2-03-25 |
 |
AAC Block work on 2-03-25 |
|
|
 |
AAC block work on 3-03-25 |
 |
Stone- chips for rooftop concreting on 3-03-25 |
|
|
 |
Electrical Light fixing on 4-03-25 |
 |
Roof Top Rail fixing on 4-03-25 |
|
|
 |
Exterior wall plastering on 5-03-25 |
 |
Lifting Roof top rail on 5-03-25 |
|
|
 |
Welding work on 6-03-25 |
 |
Site sheeting on 6-03-25 |
|
|
 |
Inter Plastering on 7-03-25 |
 |
Steel Structure paintimg on 7-03-25 |
|
|
 |
Inside Plastering on 8-03-25 |
 |
Side Sheeting work on 8-03-25 |
|
|
 |
Gutter mobilized on 9-03-25 |
 |
Plastering on 9-03-25 |
|
|
 |
Interior AAC block work on 10-03-25 |
 |
Welding steel structure on 10-03-25 |
|
|
 |
Interior AAC block work on 11-03-25 |
 |
Welding work on 11-03-25 |
|
|
 |
Side sheeting on 12-03-25 |
 |
Welding work on 12-03-25 |
|
|
 |
Side sheeting on 13-03-25 |
 |
Welding work on 13-03-25 |
|
|
 |
Side sheeting on 14-03-25 |
 |
Side sheeting on 14-03-25 |
|
|
 |
AAC block work on 15-03-25 |
 |
Side Sheeting work on 15-03-25 |
|
|
 |
Side sheeting on 16-03-25 |
 |
Welding work on 16-03-25 |
|
|
 |
Window delivered on 17-03-25 |
 |
Welding work on 17-03-25 |
|
|
 |
Interior painting on 18-03-25 |
 |
Site sheeting on 18-03-25 |
|
|
 |
Interior AAC block work on 19-03-25 |
 |
Checkered plate grinding on 19-03-25 |
|
|
 |
Interior plastering on 20-03-25 |
 |
Ground floor re-bar work on 20-03-25 |
|
|
 |
Interior plastering on 21-03-25 |
 |
Side sheeting on 21-03-25 |
|
|
 |
Stair Railing fixing on 22-03-25 |
 |
Welding work on 22-03-25 |
|
|
 |
Interior AAC block work on 23-03-25 |
 |
Interior painting work on 23-03-25 |
|
|
 |
Exterior wall plastering on 24-03-25 |
 |
Roof top concreting on 24-03-25 |
|
|
 |
Interior painting on 25-03-25 |
 |
Site sheeting on 25-03-25 |
|
|
 |
Interior AAC block work on 26-03-25 |
 |
Site sheeting on 26-03-25 |
|
|
 |
Interior painting on 27-03-25 |
 |
Interior painting on 27-03-25 |
|
|
 |
Fire works on 28-03-25 |
 |
Cleaning works on 28-03-25 |
|
|