Site Photographs |
|
on 18-09-20 |
|
on 18-09-20 |
|
|
|
on 6-11-20 |
|
on 6-11-20 |
|
|
|
Tower-1 Pile Cap on 12-11-20 |
|
Tower-2-Pile Work on 12-11-20 |
|
|
|
Tower-2-Piling Work on 28-11-20 |
|
Tower-1-Pile Cap Work on 28-11-20 |
|
|
|
Tower-1 Pile Cap on 30-11-20 |
|
Tower-1-Pilehead breaking on 30-11-20 |
|
|
|
Tower-1-Grade Beam on 4-12-20 |
|
Tower-2-Pile Work on 4-12-20 |
|
|
|
Column Work on 7-12-20 |
|
Tower-1 Grade Beam on 7-12-20 |
|
|
|
Tower-1-Excavation for Pile Cap on 9-12-20 |
|
Tower-2-Pile Work on 9-12-20 |
|
|
|
Tower-1-Pile Cap Re-bar Fabrication on 12-12-20 |
|
Tower-1-Pilecap Concreting on 12-12-20 |
|
|
|
Tower-1-Coliumn Re-bar work on 15-12-20 |
|
Tower-1-GF Beam Shuttering on 15-12-20 |
|
|
|
Tower-1-Grade Beam Re-bar Fabrication on 18-12-20 |
|
Tower-1-GF Beam Shuttering on 18-12-20 |
|
|
|
Tower-1-Lift Core Re-bar Work on 20-12-20 |
|
Tower-1-GF Slab Re-bar Work on 20-12-20 |
|
|
|
Tower-1-GF Roof Slab-2000 sft Concreting on 21-12-20 |
|
Tower-1-GF Roof Slab Concreting on 21-12-20 |
|
|
|
Tower-1-Grade Beam Shuttering on 24-12-20 |
|
Tower-2-Excavation for Pile Head Breakin on 24-12-20 |
|
|
|
Tower-1-GF Stair Shuttering on 27-12-20 |
|
Tower-2-Pile Head Breaking on 27-12-20 |
|
|
|
Tower-1-1st Floor Roof Slab Shuttering on 8-01-21 |
|
Tower-2-Pile Cap Concreting on 8-01-21 |
|
|
|
Tower-1-1st Floor Roof Slab 3600 sft Co on 11-01-21 |
|
Tower-1-1st Floor Roof Slab Concreting on 11-01-21 |
|
|
|
Tower-1-GF Roof Slab-3600sft Concreting on 16-01-21 |
|
Tower-1-GF Roof Slab Concreting on 16-01-21 |
|
|
|
Tower-1-GF Roof Slab 1800 sft Concreting on 18-01-21 |
|
Tower-1-1st Floor Roof Beam Shuttering on 18-01-21 |
|
|
|
Tower-1-GF Roof Slab-4250sft Concreting on 27-01-21 |
|
Tower-1-Lift Core and Slab Shuttering on 27-01-21 |
|
|
|
Tower-1-1st Floor Roof Slab 3600 sft Con on 5-02-21 |
|
Tower-2-GB Shutter Removing on 5-02-21 |
|
|
|
Tower-1-1st Floor Roof Slab 3600 sft Con on 7-02-21 |
|
Tower-1-1st Floor Roof Slab Concreting on 7-02-21 |
|
|
|
Tower-2-Grade Beam Shuttering on 10-02-21 |
|
Tower-1-1st floor Roof Slab 2450sft Conc on 10-02-21 |
|
|
|
Tower-1-2nd Floor Roof Slab-3600sft Conc on 16-02-21 |
|
Tower-2-Column Re-bar Work on 16-02-21 |
|
|
|
Tower-1-3rd Floor Column Re-bar Work on 23-02-21 |
|
Restaurant Area Slab Shutttering on 23-02-21 |
|
|
|
Tower-1-2nd Floor Roof Inspection on 25-02-21 |
|
Tower-1-2nd Floor Roof Curing on 25-02-21 |
|
|
|
Tower-1-3rd Floor Column Shuttering on 28-02-21 |
|
Resturant Area Slab Shuttering on 28-02-21 |
|
|
|
Restaurant-Double Height Slab Concreting on 2-03-21 |
|
Tower-1-3rd Floor Lift Core Re-bar Work on 2-03-21 |
|
|
|
Tower-1-3rd Floor Roof Slab Concreting on 11-03-21 |
|
View From South on 11-03-21 |
|
|
|
Tower-1-3rd Floor Roof Slab Shuttering on 13-03-21 |
|
Short Coulmn on 13-03-21 |
|
|
|
Restaurant GF Double Height Slab-6-9/A-B on 23-03-21 |
|
Tower-1-3rd Floor Roof Slab-Beam Shutter on 23-03-21 |
|
|
|
4th Floor Slab(3-5/B-E) Concreting-3600s on 24-03-21 |
|
Lift Core Wall Shuttering on 24-03-21 |
|
|
|
Tower-2: Lift Wall De-shuttering Work on 25-03-21 |
|
Column Shuttering Work on 25-03-21 |
|
|
|
Restaurant-GF Double Ht Roof Slab-Re-bar on 30-03-21 |
|
Tower-1-3rd Flr Roof Slab(B-E/5-6)Conret on 30-03-21 |
|
|
|
Tower-1-3rd Floor Roof Slab(B-E/6-7)Conc on 31-03-21 |
|
Tower-1-3rd Floor Roof Slab Curing on 31-03-21 |
|
|
|
Restaurant-GF Doubl Ht Roof Slab-Re-bar on 1-04-21 |
|
Tower-1-3rd Floor Roof Slab Curing on 1-04-21 |
|
|
|
on 11-04-21 |
|
on 11-04-21 |
|
|
|
Tower-2-Gr.Flr Roof Slab(5a-6/H-J) Concr on 12-04-21 |
|
on 12-04-21 |
|
|
|
on 19-04-21 |
|
Tower-1-GF Roof Slab(G-I/6-7a)Concreting on 19-04-21 |
|
|
|
Restaurant GF Doubl Ht Slab-1-4/A-B-Conc on 24-04-21 |
|
on 24-04-21 |
|
|
|
Between Tower1-2-GF Roof Slab-Conreting on 26-04-21 |
|
Lift Core Wall Shuttering on 26-04-21 |
|
|
|
Beam Shuttering on 28-04-21 |
|
Column Concreting on 28-04-21 |
|
|
|
Column Concreting on 29-04-21 |
|
Beam Shuttering on 29-04-21 |
|
|
|
Beam Shuttering Work on 30-04-21 |
|
Column Shuttering Work on 30-04-21 |
|
|
|
Roof Slab Shuttering on 2-05-21 |
|
Tower-2-Lift Core Deshuttering on 2-05-21 |
|
|
|
Roof Slab Shuttering on 4-05-21 |
|
Roof Slab Shuttering on 4-05-21 |
|
|
|
Roof Beam Shuttering on 9-05-21 |
|
Curing Work on 9-05-21 |
|
|
|
Restaurant GF Double Height Roof Slab on 24-05-21 |
|
Roof Slab De-shuttering on 24-05-21 |
|
|
|
Slab Shuttering on 31-05-21 |
|
Beam Shuttering on 31-05-21 |
|
|
|
Between Tower1-2-1st Flr Roof Slab-Concr on 5-06-21 |
|
Slab Re-bar Work on 5-06-21 |
|
|
|
Restaurant-3rd Floor Slab Concreting on 12-06-21 |
|
Restaurant-3rd Floor Slab Re-bar Work on 12-06-21 |
|
|
|
Restaurant-3rd Floor Slab Concreting on 16-06-21 |
|
Restaurant-3rd Floor Slab Concreting on 16-06-21 |
Grid:1-6/ A"-B=3300 sft |
|
|
Tower-1-4th Floor Concreting on 22-06-21 |
|
Tower-2-2nd Floor Slab Shuttering on 22-06-21 |
Grid:5-8=877sft-West Verandhah Concreting |
|
|
Tower-1-4th Floor Concreting on 26-06-21 |
|
Tower-2-2nd Floor Slab Shuttering on 26-06-21 |
Grid:1-4/A-B=90sft Slab Concreting |
|
|
Tower-2:2nd floor slab re-bar work on 4-07-21 |
|
Tower-2:2nd floor slab concreting on 4-07-21 |
G-I/6-7a: 3300 sft |
|
|
Tower-2:2nd floor slab concreting on 5-07-21 |
|
Tower-2-Column Rod binding-shuttering on 5-07-21 |
G-I/5a-6: 1500 sft |
|
|
Tower-2:2nd flr double height slab concr on 26-09-21 |
|
Tower-2:2nd floor slab concreting on 26-09-21 |
5-8/I-K: 3200 sft |
|
|
Tower-2-2nd Floor-Column Concreting on 30-09-21 |
|
Tower-2-2nd Floor-Column Concreting on 30-09-21 |
|
|
|
Tower-2 on 17-10-21 |
|
Tower-2-2nd Floor-Column Re-bar Work on 17-10-21 |
|
|
|
Tower-2-3rd Floor Slab Shutter Reparing on 28-10-21 |
|
Tower-2-2nd Floor Column Concreting on 28-10-21 |
|
|
|
Tower-2-3rd Flr Slab-Plain Sheet laying on 31-10-21 |
|
Tower-2-3rd Flor Slab-Rod Lifting on 31-10-21 |
|
|
|
Tower-2-3rd Floor Beam Re-bar work on 1-11-21 |
|
Tower-2-3rd Floor Beam Re-bar fabricatio on 1-11-21 |
|
|
|
Tower-2-3rd Floor Beam shuttering on 14-11-21 |
|
Tower-2-3rd Floor Beam shuttering on 14-11-21 |
|
|
|
Tower-2-3rd Floor Slab Shuttering on 30-11-21 |
|
Hollow box jointing for slab shuttering on 30-11-21 |
|
|
|
Tower-2-3rd Floor Slab-shuttering on 1-12-21 |
|
MS Prop Repairing on 1-12-21 |
|
|
|
Re-bar Fabrication on 31-12-21 |
|
Tower-2:3rd floor slab re-bar work on 31-12-21 |
|
|
|
Re-bar Fabricating on 1-01-22 |
|
Tower-2-3rd Floor-Re-bar Work on 1-01-22 |
|
|
|
Re-bar Cutting on 8-01-22 |
|
Tower-2-3rd Floor-Re-bar Work on 8-01-22 |
|
|
|
Septic Tank Wall Concreting on 27-01-22 |
|
Soak Well Slab Concreted on 27-01-22 |
|
|
|
Septic Tank Wall Curing on 31-01-22 |
|
Septic Tank Wall Plastering on 31-01-22 |
|
|
|
East Septic Tank Plastering on 1-02-22 |
|
East Septic Tank Plastering on 1-02-22 |
|
|
|
East Septic Tank Slab Shuttering on 10-02-22 |
|
East Septic Tank Slab Shuttering on 10-02-22 |
|
|
|
Column/Wall Steel Shutter Cleaning, Oili on 21-02-22 |
|
Column/Wall Steel Shutter Cleaning, Oili on 21-02-22 |
|
|