Return Main Menu Another Type

ITEM RATE
Click on Update to see the All Suppliers Rate or Another Type
L2 Work Rate-1
Code Item Unit PWD Rate(Tk.) Actual Rate(Tk.) Update
L201 Breaking 50mm brick-chips cft 8.70
L202 Breaking 20mm brick-chips cft 9.70
L203 Side Shuttering-wooden sft 9.00
L204 Fabricat Shutter-use 30t sft 3.00
L205 Fitting-steel shutter sft 18.00
L206 Cut, bend sheet-use 30 t rft 0.29
L207 Weld, grind sheet-use 30t rft 1.06
L208 MS Grill-Solid/Hollow fab sft 51.00
L209 Fabricating SS Grill sft 500.00
L210 Polishing SS Railing sft 66.67
L211 Wood shuttering i/c makin sft 18.00
L213 Breaking 12mm brick-chips cft 12.20
L214 Patent stone shuttering sft 3.00
L215 Extra cost-shutter sortin sft 16.04
L216 Extra labor-shutter place sft 4.80
L217 Truss fabricat/erect/pain kg 52.00
L218 Load-test platform making ton 275.00
L219 Fill,stich,load,unload bag 12.00
L220 Make steel shutter-use 16 sft 5.63
L221 Fixing Precast pile shutt sft 12.00
L222 Pile Shoe making No. 1100.00
L223 Cut 12mm plate by oxy-ace rft 37.00
L224 Grind 12mm plate to V bev rft 52.50
L225 25mm Hole make12mm plate No. 52.50
L226 Cut 6mm plate by oxy-ace rft 15.00
L227 Grind 6mm plate to V bev rft 80.00
L228 Bend 6mm plate rft 34.00
L229 50mm Hole make 6mm plate no. 125.00
L230 Fabricating MS Bar kg 6.70
L231 Fabricating Canopy kg 20.00
L232 Drilling 50mm depth No. 5.50
L233 Fabricating Angle kg 7.19
L234 Fixing MS Angle door fram No. 408.33
L235 Glass cutting, fix, putty sft 18.70
L236 Timber seasoning cft 32.00
L237 Steel Window fabricating sft 78.00
L238 Steel Window fixing No. 198.53
L239 MS Door Fabricating sft 47.26
L240 Cutting Groove-50x50x150 No. 18.33
L241 Grill Rod/ FI Bar Fabrica sft 51.00
L242 Fixi Glass in Alum Fram-6 sft 11.00
L245 Making Hole-Collapsible Nos. 27.50
L246 Making Groove in Floor rft 27.50
L248 Making Hole-MS Gate Nos. 22.92
L250 Rolling Shutter Cut,Stich Nos. 33.00
L256 MS Angle Cutting-Nosing Nos. 10.00
L257 FI Bar Welding-Nosing Nos. 10.00
L259 Making Groove-75x75x300 Nos. 45.00
L261 Alum Glass Parition fixin sft 550.00
L262 Hor/Vert roller Blind fix sft 4.00
L264 Steel Rack Fabrication kg 65.00
L265 Anchor Boltr Fixing kg 27.00
L266 Red oxide primer apply kg 0.60
L267 Structural Steel Erection kg 8.00
L268 Connection Bolt fixing kg 12.00
L269 GP Purlin/ Girt Erection kg 4.00
L270 Sag Rod Erection kg 8.00
L271 Cable/ wire bracing erect kg 8.00
L272 Shear Stud fixing kg 10.00
L273 Decking Panel erection kg 8.00
L274 Color Sheet Erection kg 8.00
L275 Double Bubble Insul fixin sft 4.65
L276 Safety Canopy erection sft 18.58
L277 Cutting Glass hole nos 31.00
L278 Angle cuting-Column Guard nos 7.30
L279 Making Hole-Fencing nos 20.63
L280 uPVC Door fixing no. 240.00
L281 Glass brick work nos 52.50
L282 Laying/ placing concrete cft 19.90
L283 Labour for casting cft 16.58
L284 Repair, mainenanc shutter sft 0.08
L285 Fabricat Shutter-use 15t sft 6.00
L286 Fare Face Shuttering sft 22.50
L287 Extra Labor-polish shuttr LS 225.00
L288 Hot Rolled Pipe Erection kg 8.00
L289 Hot Rolled Channel Erecti kg 8.00
L290 Steel Bracing Erection-De kg 16.00
L291 Safety Net/Shed Fabricat sft 25.00
L292 Safety net/Shed fixing sft 30.00
L293 Scaffolding Fixing-Disman sft 16.00
L294 Fabricat, Fix Safety net sft 13.94
L295 Labour-Seasoning Timber cft 55.00
L296 Fix Glass in Alum Fram-8 sft 16.50
L297 Fix Glass in Alum Fram-10 sft 22.00
L298 Fix Glass in Alum F-13.52 sft 33.00
L299 Fix Glass in Alum F-17.52 sft 44.00
L2A0 Fix Glass in Alum Frm-24 sft 49.50
L2A1 Extra Labor-brick mouldin rft 38.50
L2A2 Platform making-Lime Trac LS 587.50
L2A3 Polythene cover-Lime Trac LS 500.00
L2A4 MS Louver-fixing, scaffod LS 700.00
L2A5 SS CollapsibleGate Polish LS 500.00
L2A6 Excavation (underground) cft 3.88
L2A7 Sand (FM 0.8) bedding-UG cft 19.00
L2A8 Water Purifier installatn perc 0.02
L2A9 Water Dispenser installat no. 50.00
L2AA Adjustable Hanger-Cutting no. 10.00
L2AB Punching Hole-Good damage no. 25.00
L2AC Septic Tank-Fill,Clean LS 1500.00
L2AD STP-Fill, Clean, Cow-dung LS 3300.00