ITEM RATE |
Click on Update to see the All Suppliers Rate or Another Type |
E1 |
Equipment/ Scaffoldi |
|
|
|
|
Code |
Item |
Unit |
PWD Rate(Tk.) |
Actual Rate(Tk.) |
Update |
E101 |
Survey Instrument Hire ch |
set |
1000.00 |
|
|
E102 |
Scaffolding |
sft |
10.00 |
|
|
E103 |
Mixer m/c hire charge |
day |
1200.00 |
|
|
E104 |
Vibrator m/c hire charge |
day |
550.00 |
|
|
E105 |
Fuel for mixer m/c, vibra |
day |
1275.00 |
|
|
E106 |
Water pump-0.25 cusec |
day |
640.00 |
|
|
E107 |
Hire charge-Truck |
trip |
2300.00 |
|
|
E108 |
Truck Fare-Minimum-200cft |
trip |
2300.00 |
|
|
E109 |
Earth carriag-load/unload |
cft |
8.50 |
|
|
E110 |
Hire charge-Chain Dozer |
day |
8200.00 |
|
|
E111 |
Dozer Maintenance |
LS |
388.44 |
|
|
E112 |
Mixer m/c, pump, sundries |
LS |
907.50 |
|
|
E120 |
Mosaic cutting m/c,electr |
day |
550.00 |
|
|
E121 |
Terezzo Tiles making m/c |
day |
550.00 |
|
|
E122 |
Marble cut/shape i/c disc |
day |
550.00 |
|
|
E123 |
Marble polish m/c, stone |
day |
620.00 |
|
|
E124 |
Hire-Marble Cutting disk |
day |
450.00 |
|
|
E125 |
Hire charge-Grinding m/c |
day |
260.00 |
|
|
E126 |
In-situ piling rig-hire |
day |
8500.00 |
|
|
E127 |
Hire charge-Mud Pump-3 HP |
day |
645.00 |
|
|
E128 |
MS Steel Tank-1950x3000x |
trip |
350.00 |
|
|
E129 |
Hire charge of truck |
trip |
2300.00 |
|
|
E130 |
Hire Load TestEquip<=200t |
test |
7000.00 |
|
|
E131 |
Precast pile driving rig |
day |
6000.00 |
|
|
E132 |
Truck Fare-load/ unload |
trip |
15200.00 |
|
|
E134 |
Auto Rig, crane,Gene,hamm |
day |
25200.00 |
|
|
E135 |
Micro pile driving equipm |
day |
5000.00 |
|
|
E136 |
PIT-1st 12-within 100km |
test |
23000.00 |
|
|
E137 |
Mechanical Timber Seasoni |
cft |
150.00 |
|
|
E138 |
Texture Paint Machinary |
LS |
500.00 |
|
|
E139 |
Motor,car,gearbox,cable |
LS |
500000.00 |
|
|
E140 |
Cons SupLift Installation |
kg |
10.00 |
|
|
E141 |
Supervision Lift Dismantl |
kg |
6.00 |
|
|
E142 |
Diesel Pump-1 cusec |
day |
1300.00 |
|
|
E143 |
Diesel Pump-Fuel,Maintena |
day |
600.00 |
|
|
E144 |
Electric Pump-1 cusec |
day |
800.00 |
|
|
E145 |
Elect Pump-Fuel,Maintenan |
day |
300.00 |
|
|
E146 |
Mechanical Sprayers etc |
LS |
773.44 |
|
|
E147 |
Brush and Mixing Device |
LS |
1117.19 |
|
|
E148 |
Hire charge-Rig set |
no |
76300.00 |
|
|
E149 |
Hire charge-Crane |
no |
55000.00 |
|
|
E150 |
Hire charge-Air Compresso |
no |
5300.00 |
|
|
E151 |
Hire charge-ConcreteingEq |
no |
5300.00 |
|
|
E152 |
Hire charge-Generator |
no |
5300.00 |
|
|
E153 |
Hire charge-Excavator |
no |
10000.00 |
|
|
E154 |
Hire charge-Desander |
no |
6450.00 |
|
|
E155 |
Hire charge-Mud silo |
no |
1100.00 |
|
|
E156 |
Hire charge-Dump truck |
no |
5000.00 |
|
|
E157 |
Hire cgarge-Water bowser |
no |
5600.00 |
|
|
E158 |
Fuel consumption-Rig set |
LS |
10000.00 |
|
|
E159 |
Fuel-crane,compressor,exc |
LS |
20000.00 |
|
|
E160 |
Fuel-Generator, Dump truc |
LS |
20000.00 |
|
|
E161 |
Calibration Pressure Guag |
no. |
5400.00 |
|
|
E162 |
Hire Load Test Equip>200t |
no. |
9000.00 |
|
|
E163 |
Trailor Fare |
trip |
45600.00 |
|
|
E164 |
Hire Charge-Hydraulic Rig |
day |
76200.00 |
|
|
E165 |
Generator, Fuel,Lubricant |
day |
20400.00 |
|
|
E166 |
Hydraulic, Gen-Maint,Insu |
day |
5000.00 |
|
|
E167 |
Design paint apply tool |
LS |
601.56 |
|
|
E168 |
Workshop Charge |
perc |
0.05 |
|
|
E169 |
Hire-operat cost-BatchPla |
cft |
7.73 |
|
|
E170 |
Hire-operat cost-Payloadr |
cft |
3.71 |
|
|
E171 |
Hire-operat cost-Pump |
cft |
5.83 |
|
|
E172 |
Hire-operat cost-TransitM |
cft |
4.05 |
|
|
E173 |
BatchPlant Generator Cost |
cft |
3.00 |
|
|
E174 |
Batching Plant Fuel cost |
cft |
4.00 |
|
|
E175 |
RMC Production cost |
cft |
11.61 |
|
|
E176 |
Re-bar forging-thread m/c |
set |
12000.00 |
|
|
E177 |
Cold extrusion press m/c |
set |
4500.00 |
|
|
E178 |
PIT Test after 12 test |
each |
1200.00 |
|
|
E179 |
Sheet Pile-Carry-Load-Unl |
kg |
1.85 |
|
|
E180 |
HC of Auto Gas Cutter Set |
day |
750.00 |
|
|
E181 |
Generator Power Consumpti |
KWH |
11.00 |
|
|
E182 |
Welding machine |
day |
750.00 |
|
|
E183 |
Crawler Crane-55T-Hammer |
day |
34692.00 |
|
|
E184 |
Crawlwer Crane-55t, Fuel |
day |
19692.00 |
|
|
E185 |
Truck Fare-Loading-Unload |
trip |
1850.00 |
|
|
E186 |
Joist Driving Rig Set |
day |
6000.00 |
|
|
E187 |
Joist Driving Rig-Fuel |
day |
3000.00 |
|
|
E188 |
Seasoning Timber |
cft |
165.00 |
|
|
E189 |
SS Railing workshop charg |
LS |
1500.00 |
|
|
E190 |
Curtain Wall-Machineries |
LS |
1718.75 |
|
|
E191 |
MS Louver-Workshop charge |
LS |
3000.00 |
|
|
E192 |
Overhead Water Tank carry |
LS |
320.00 |
|
|
E193 |
Internal Water Tank carry |
LS |
160.00 |
|
|
E194 |
Fero-cem Wate rTank carry |
LS |
500.00 |
|
|
E195 |
Antti-termite hand spray |
LS |
11.94 |
|
|