WDB RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
4023010 CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 60cmx60cmx60cm each
3030.00
4023015 CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 50cmx50cmx50cm each
1753.00
4023020 CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 50cmx50cmx40cm each
1402.00
4023035 CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 40cmx40cmx40cm each
897.00
4023045 CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 35cmx35cmx35cm each
601.00
4023060 CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 25cmx25cmx25cm each
219.00
4027020 Labour charge in laying CC blocks : 200 m to 500 m cum
2065.00