WDB RATE SCHEDULE-2022 Updating.. | ||||
---|---|---|---|---|
Click on Code to see the analysis or Go Home | Profit=10%, Overhead=3.5%, VAT=5.5% | |||
Code | Item | Unit | Cost(Tk.) | Unit Rate(Tk.) |
4023010 | CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 60cmx60cmx60cm | each | 3030.00 |
|
4023015 | CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 50cmx50cmx50cm | each | 1753.00 |
|
4023020 | CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 50cmx50cmx40cm | each | 1402.00 |
|
4023035 | CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 40cmx40cmx40cm | each | 897.00 |
|
4023045 | CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 35cmx35cmx35cm | each | 601.00 |
|
4023060 | CC blocks (1:2:4): 40mm stone chips;sand FM>=2.0: 25cmx25cmx25cm | each | 219.00 |
|
4027020 | Labour charge in laying CC blocks : 200 m to 500 m | cum | 2065.00 |