WDB RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
1610000 Erection of bamboo profile with full bamboo posts and pegs not less than 60mm in diameter and coir each strings etc. complete as per direction of Engineer in charge each
324.00
398.13
1611010 Earth work by manual labour in constructing/ resectioning of embankment/ canal bank/ road etc. with clayey soil(minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m, and all lifts including throwing the cum spoils to profiles in layers not exceeding 150mm in hickness, clod breaking upto a maximum size of 100mm, benching the side slopes, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, cutting trees upto 200mm girth, with uprooting stumps, clearing jungles, bailing out water, rough dressing and 150mm cambering at the centre of the crest etc. complete as per specification and direction of Engineer in charge. 0 to 3 m height. cum
203.00
248.82
1611020 Earthwork by Manual labour embk/ canel bank/road : 0 to 4 m height. cum
217.00
266.84
1611030 Earthwork by Manual labour embk/ canel bank/road : 0 to 5 m height. cum
232.00
284.93
1611040 Earthwork by Manual labour embk/ canel bank/road : 0 to 6 m height. cum
247.00
302.74
1612010 Earth work by manual labour in constructing/ resectioning of embankment! canal bank/ road etc. compacted to 85%/90% maximum dry density at optimum moisture content, with reference to laboratory density test AAHSTO modified hammer, with clayey soil(minm 30% clay, 0-40% silt, 0-30% sand) within the initial lead of 30m and all lifts including throwing the spoils to profiles in layers not exceeding 230mm in thickness with clod breaking to a maximum size 68 of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm from the ground, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, bail out of water, rough dressing including 150mm cambering at the centre of crest etc. complete, ncluding maintenance of the same for 6 months after completion, (compaction will be done by the contractor with approved equipment, including all ancillary charges for compaction and testing) as per direction of Engineer in charge. 0 m to 3 m height with 85% compaction. cum
239.00
292.68
1612020 Construction of Embankment: o m to 4 m height with 85% compaction. cum
253.00
310.70
1612030 Construction of Embankment: o m to 5 m height with 85% compaction. cum
268.00
328.78
1612040 Construction of Embankment: o m to 6 m height with 85% compaction. cum
283.00
346.80
1612050 Construction of Embankment: o m to 3 m height with 90% compaction. cum
257.00
315.11
1612060 Construction of Embankment: o m to 4 m height with 90% compaction. cum
271.00
333.13
1612070 Construction of Embankment: o m to 5 m height with 90% compaction. cum
286.00
351.22
1612080 Construction of Embankment: o m to 6 m height with 90% compaction. cum
301.00
369.24
1613010 Earth work by manual labour in resectioning of embankment! canal bank! river slopes! road! compound etc. manually compacted by 7.0 kg iron rammer to avoid any air pocket in clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m and all lifts including throwing the spoils to profile in layers not exceeding 150mm thickness with clod breaking to a maximum of 100mm, removing roots and stumps of trees of girth upto 200mm from the ground, benching the side slopes, stripping! ploughing the base of embankment and borrowpit areas, dug bailing, bailout of water, rough dressing including 150mm cambering at the centre of necessary) the crest (where etc. complete as per direction of ngineer in charge. 0 m to 3 m height cum
248.00
304.06
1613020 Earthwork ny Manual Labour Manual Compaction: 0 m to 4 m height cum
262.00
322.08
1613030 Earthwork ny Manual Labour Manual Compaction: 0 m to 5 m height cum
277.00
340.24
1613040 Earthwork ny Manual Labour Manual Compaction: 0 m to 6 m height cum
292.00
358.19
1614010 Compaction of earth in resectioning of embankment! canal bank! road! river bank slopes! compounds etc as per design to profile in layers not exceeding 50mm in thickness in all kinds of soils etc. complete as per direction ofEngineer in charge. By engine operated vibratory soil compactor to attain 80% maximum dry density at optimum moisture content with reference to laboratory density test ASHTO180 modified hammer cum
44.00
54.59
1614020 Compact Earth By 7.00 kg. iron rammer to remove all voids from soil. cum
45.00
55.24
1615010 Compaction of constructing!resectioning embankment/bank/road!river earth slopes mechanical etc. in of canal by equipment to attain 85% / 90% maximum dry density at optimum moisture content with reference to laboratory density. test AASTHO-180 modified hammer in all kinds of soils as per direction of Engineer in charge. O.Om to 6.0m height and above, with 85% compaction. cum
36.00
43.86
1615020 Compaction of Earth: O.Om to 6.0m height and above, with 85% compaction. cum
54.00
66.29
1616000 Extra rate for every additional lead of 5m or part thereof beyond the initial lead of 30m upto a maximum of 19 leads (3m neglected) for all kinds of earth work. cum
28.00
34.44
1617000 Extra rate for every additional lift of l.Om or part thereof beyond the initial of 1.5m lift neglected) for all kinds of earth (30cm work. cum
15.00
17.82
1618000 Royalty of specified earth taken from private land (with prior permission of the Executive Engineer on production of royalty deeds with the land owner) from the area to be selected by the contractor with mutual agreement. cum
18.00
22.09
1620010 Earth work by carried earth by truck/boat or any other means supplied at contractors own cost (including royalty) in constructing/ resectioning of the embankment/ canal bank/ road etc. in layey soil (minimum 30% clay, 0-40% silt and 0-30% sand) beyond the initial lead of 300m including throwing the spoils to a profile in layers not exceeding 150mm in thickness, breaking clods, benching the side slopes, stripping the base of embankment and borrow pit area, dug bailing, cutting trees upto 200mm girth with uprooting stumps, clearing jungles, bail out of water, rough dressing and 150mm cambering at the centre of the crest etc. complete as per design, specification and direction of Engineer in charge. cum
403.00
494.24
1620020 Earthwork by carried Earth: l.00 km. to 5.00 km. (Extra rate) cum
52.00
63.38
1621010 Earth work by Carried Earth (by truck/boat or any other means) supplied at contractors own cost (including royalty) in resectioning of embankment! canal /bank/ river slopes/ road/ compound etc. manually compacted by 7.0 kg iron rammer to avoid any air pocket with clayey soil (minimum 30% clay, 0-40% silt, 0-30% sand) beyond the initial lead of300m and all lifts including throwing the spoils to profile in layers not exceeding 150mm thickness with clod breaking to a maximum size of 100mm, removing roots and stumps of trees of girth upto 200mm from the ground, benching the side slopes, stripping/ ploughing the base of embankment and borrowpit areas, dug bailing, bailout of water, rough dressing including 150mm cambering at the centre of the crest (where necessary) etc. complete as per direction of Engineer in charge 300 m to 1.00 km. cum
448.00
549.48
1621020 Earthwork caried Earth (manual Compaction):: l.00 km. to 5.00 km. (Extra rate) cum
52.00
63.38
1622010 Earth work by carried earth (by truck/boat or any other means) supplied at contractors own cost (including royalty) in constructing/ resectioning of the bank/road etc. compacted to 85%!90% maximum dry density at optimum moisture content withreference to laboratory density test AASHTO modified hammer, with clayey soil (minimum 30% clay, 040% silt and 0-30% sand) beyond initial lead of 300m including throwing the spoils to profiles in layer not exceeding 230mm in thickness with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete(compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. 300m to 1.00 km (85% compaction) cum
406.00
497.84
1622020 Earthwork by carried earth : 1.00 km.to 5.00 km. 85% compaction,(Extra rate). cum
72.00
88.12
1622030 Earthwork by carried earth : 300m to 1km 90% compaction, cum
428.00
525.23
1622040 Earthwork by carried earth : 1.00 km.to 5.00 km. 90% compaction,(Extra rate). cum
85.00
103.82
1623010 Earth work by Excavator (Long Boom ) in constructing/resectioning embankment!canal bank/road etc. with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m, and all lifts including throwing the spoils to profiles in layers not exceeding 150mm in thickness, clod breaking upto a maximum size of 100mm bencing the side slopes, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, cutting trees upto 200mm girth, with uprooting stumps, clearing jungles, rough dressing and 150mm cambering at the centre of the crest etc. complete as per specification and direction of Engineer in charge. Embankment by mechanical excavator, ht: 0 to 4m cum
141.00
173.49
1623020 Embankment by mechanical excavator, ht: 4 m above cum
170.00
208.29
1623580 Clay cover: 0 m to 5 m height with 90% compaction. cum
301.00
369.24
1624010 Earth work by Mechanical Excavator (Long Boon) in constructing/ resectioning of embankment! canal bank/ road etc. compacted to 85%/90% maximum dry density at optimum moisture content, with reference to laboratory density test AAHSTO modified hammer, with clayey soil(minm 30% clay, 0-40% silt, 0-30% sand) within the initial lead of 30m and all lifts including throwing the spoils to profiles exceeding in layers not 230mm in thickness with clod breaking to a maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm from stripping/ploughing the ground, the base of embankment and borrow pit area, dug bailing, including rough dressing 150mm cambering at the entre of crest etc. complete, including maintenance same for 6 months of the after completion, (compaction will be done by the contractor with approved equipment, including all ancillary charges for compaction and testing) as per direction of Engineer in charge. Embankment by Mech. Equipment ht: 0 to 4m, 85% comp cum
166.00
203.76
1624020 Embk. by Mech. Equipment; ht: 4 to 6m and above; 85% comp cum
192.00
235.95
1624030 Embk. by Mech. Equipment; ht: 0 to 4m; 90% comp cum
171.00
210.50
1624040 Embk. by Mech. Equipment; ht: 4 to 6m and above; 90% comp cum
198.00
242.69
1625010 Earth work by carried earth (by truck/boat or any other means) supplied at contractors own cost (including royalty) in constructing/ resectioningof the embankment!/canal bank/ road etc. by Mechanical Excavator (Long Boon) compacted to 85%!90% maximum dry density at optimum moisture content with reference to laboratory density test AASHTO modified hammer, with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) beyond initial lead of 300m including throwing the spoils to profiles in layer not 16-250-00 exceeding 230mm in thickness with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for testing) as compaction per direction of Engineer in charge. 300 m to 1 km and Embk. ht: 0 to 4 m with 85% Comp cum
333.00
408.93
1625020 300 m to 1 km and Embk. ht: 4 m above with 85% Comp cum
360.00
441.11
1625030 300 m to 1 km and Embk. ht: 0 to 4 m with 90% Comp cum
338.00
415.67
1625040 300 m to 1 km and Embk. ht: 4 m above with 90% Comp cum
365.00
447.86
1625050 1 km to 1 km and Embk. ht: 0 to 4 m with 85% Comp cum
405.00
497.05
1625060 1 km to 1 km and Embk. ht: 4 m above with 85% Comp cum
431.00
529.24
1625070 1 km to 1 km and Embk. ht: 0 to 4 m with 90% Comp cum
410.00
503.79
1625080 1 km to 1 km and Embk. ht: 4 m above with 90% Comp cum
437.00
535.98
1626010 Earth work by borrowing earth from river bed (all kind of soil but excluding organic material) and carried to site by any means by contractor constructing/re-sectioning of embankment with in initial distance of 1.0 km and with all necessary lift including throwing the earth to profiles in layers not exceeding 150 mm in thickness with prior preparation of base of the embankment by stripping/ ploughing, dug bailing, cutting trees up to 200 mm girth with uprooting stumps, clearing jungles, bailing out water, breaking clods, benching the side slopes, rough dressing and cambering the crest to a height of 150 mm at the center and compacting to minimum dry density at optimum moisture content with reference to laboratory density test AASHTO modified hammer with suitable equipment complete specification as dressing etc per design and direction of Engineer-in-charge. Location of river bed from where earth will be collected and quality of borrow soil must have prior approval from the Engineer-in-charge. In circumstances, borrowed earth agriculturallhomestead shall no be from land. The borrow earth have to be collected from river bed by avoiding any detrimental impact on the river channel. Borrowed earth from river bed: upto to 1.00 km (85% compaction). cum
424.00
520.67
1626020 Borrowed earth from river bed: Beyond 1.00 km to 5.00 km, 85% compaction (extra rate). cum
72.00
88.12
1626030 Borrowed earth from river bed: From upto 1.00 km (90% compaction). cum
445.00
545.72
1626040 Borrowed earth from river bed: Beyond 1.00 km to 5.00 km, 90% compaction (extra rate). cum
85.00
103.82
1631010 Providing clay blanket/clay core by carried earth supplird at contractors own cost (including royalty) in different thickness over embankment crest and side slopes/embankment core/bed and slope of irrigation canal/crest and side slopes of irrigation canal dykes etc. with elected clay (clay content minimum 80% and silt , content maximum 20%) including throwing clay in layers not exceeding 150mm in thickness, clod breaking, benching the side slopes, and compacting to 85% maximum dry density at optimum moisture content with suitable equipment, dressing etc. complete (clay blanket should be extended upto 0.5m below the berm on the outside of embankment/ irrigation canal dyke etc.) as per design, specification and direction of Engineer in charge 0.00m to3000m cum
543.00
665.97
1631020 Clay Blanket: Carried by truck/boat or any means: 00m to 1.0km. cum
520.00
625.61
1631030 Clay Blanket: Carried by truck/boat or any means: 1.0 km to 5.0 km (Extra Rate) cum
49.00
60.03
1632010 Providing clay cover by carried earth by any means in different thickness over the side slopes or crest of the embankment with selected soil (clay soil with a plasticity index between 10 and 20% and liquid limit between 30 and 50% that falls above the A-Line in the Casagrande Plasticity Chart) including throwing clay in layers not exceeding 230 mm in thickness, clod breaking, benching the side slopes and compacting to 90% minimum dry density at optimum moisture content with reference to laboratory density tes AASHTO modified hammer with suitable equipment dressing etc. complete as per direction of Engineer-in-charge. Composition of specified soil must be confirmed by laboratory test (from a recognized Institute) before use. Compaction of the soil must also be confirmed by test {expenditure for all Test is the responsibility of contractor). Carried earth by any means: upto 1.00 km. cum
525.00
644.35
1632020 Carried earth by any means:Beyond 1.00 km to 5.00 km (Extra rate). cum
85.00
103.82
1632510 Earth work by manual labour for clay cover in different thickness over the side slopes or crest of the embankment with selected soil (clay soil with a plasticity index between 10 and 20 % and liquid limit between 30 and 50% that falls above the Casagrande A-Line Plasticity in the Chart) including throwing clay in layers not exceeding 230 mm in thickness, clod breaking, benching the side slopes and compacting to 16-325-00 90% minimum dry density at optimum moisture content with reference to laboratory density test AASHTO modified hammer with suitable equipment dressing etc. complete as per direction of Engineer-in-charge. Composition of specified soil must be confirmed by laboratory test (from a recognized Institute) before use. Compaction of the soil must also be confirmed by test (expenditure for all Test is the responsibility of contractor) 0 m to 3 m height with 85% compaction. cum
239.00
292.68
1632520 Clay cover: 0 m to 4 m height with 85% compaction. cum
253.00
310.70
1632530 Clay cover: 0 m to 5 m height with 85% compaction. cum
268.00
328.78
1632540 Clay cover: 0 m to 6 m height with 85% compaction. cum
283.00
346.80
1632550 Clay cover: 0 m to 3 m height with 90% compaction. cum
257.00
315.11
1632560 Clay cover: 0 m to 4 m height with 90% compaction. cum
271.00
333.13
1632570 Clay cover: 0 m to 5 m height with 90% compaction. cum
286.00
351.22