WDB RATE SCHEDULE-2022 Updating.. | ||||
---|---|---|---|---|
Click on Code to see the analysis or Go Home | Profit=10%, Overhead=3.5%, VAT=5.5% | |||
04 | FOUNDATION R_WORKS | |||
Code | Item | Unit | Cost(Tk.) | Unit Rate(Tk.) |
0418000 | Site preparation by manually removing all miscellaneous objectional materials from entire site and removing debris including uprooting stumps, jungle clearing, levelling dressing etc. complete as per direction of Engineer in charge | Sqm | 36.00 |
44.52 |
0420000 | Supplying and fixing at site temporary bamboo gauges, 6cm to 9cm dia, marked in meter, decimeter and centimeter including black and white water proof painting and printing gauge, to be driven not less than 1.80m below ground (Measurement will be given only for the marked portion) as per direction of Engineer in charge. | m | 102.00 |
124.89 |
0421010 | Supplying and fixing wooden gauges at site, made of sal/gajari/sundari wood, engraved decimeter and centimeter, including water proof painting with black, white and red paint, etc. complete as per direction of Engineer in charge 150mm x 25mm, size (finished section). | m | 627.00 |
769.47 |
0421020 | Supply, fix Wood Gauge 100mm x 25mm, size (finished section). | m | 466.00 |
571.98 |
0423000 | Supplying and fixing at site triangular gauges of 15 cm size made of best quality local hard engraved wood, decimeter and centimeter, including water proof painting with black, white and red paint, etc. complete as per direction of Engineer in charge | m | 1265.00 |
1552.79 |
0424000 | Supplying and driving 2.8m long, 15 em to 20 em average dia local hard wood post of approved quality, including sizing, sharpening and providing holes for fitting gauges (driving portion not less than 1.80 m) etc. complete as per direction of Engineer in charge. | each | 1237.00 |
1517.62 |
0426000 | Fixing gauges to posts including supply of necessary bolts and nuts or nails. | each | 249.00 |
305.66 |
0428010 | Constructing at site, cement mortar gauge on masonry wall, including engraving in meter, decimeter and centimeter, painting and figuring with black and red water proof paint, etc. complete as per direction of Engineer in charge. 150mmx 25mm | m | 89.00 |
108.98 |
0428020 | Cement Concrete Gauge, Painting 100x25mm | m | 61.00 |
74.28 |
0429000 | Repairing gauge of cement concrete including plastering, painting, lettering etc. complete as per direction of Engineer in charg | m | 57.00 |
70.30 |
0431000 | Supplying 7.50 em dia bamboo sounding rods, 450 ern long, with black and white paint, at every each alternative decimeter and figuring etc. complete as per direction of Engineer in charge. | each | 359.00 |
440.13 |
0432000 | Supplying bamboo pegs 0.45 m to 0.75 m long and average dia 6 em, with saw cut top as per direction of Engineer in charge. | each | 33.00 |
41.03 |
0433000 | Labour charge for fixing the bamboo pegs 0.45m to 0.75m long and average dia 6cm, as per direction of Engineer in charge | each | 4.00 |
4.59 |
0440010 | Removing water hyacinth and stacking on the bank and burning in to ashes: Scattered | sqm | 4.00 |
4.59 |
0440020 | Water Hyacinth Remove, Stacking, Burning-Packed | sqm | 8.00 |
10.19 |
0441010 | Cutting trees and uprooting stumps and removing the same from the base of embankment and keeping in a place, as per direction of Engineer in charge. 30 ern to 1.0 m girth | each | 278.00 |
340.81 |
0441020 | Cut Tree, Uproot 1.0 -1.5 m Girth | each | 371.00 |
454.66 |
0441030 | Cut Tree, Uproot above 1.5m Girth | each | 963.00 |
1182.16 |
0444010 | Cutting and clearing jungles and uprooting trees upto 30cm girth and removing the same from the site as per direction of Enginer in charge. Ordinary | sqm | 3.00 |
3.44 |
0444020 | Cut,Clear Uprooting Tree-Thick and Thormy | sqm | 4.00 |
4.59 |
0445000 | Cutting, uprooting and removing bamboo cluster from the site as per direction of Engineer in charge. | sqm | 33.00 |
40.90 |
0446000 | Cutting, uprooting and removing cane jungles, from the site, as per direction of Engineer in charge. | sqm | 17.00 |
20.45 |
0447010 | Supplying cross nylon ropes, marked at every decimeter: 6mm dia | m | 167.00 |
205.07 |
0447020 | Supply Nylon Rope Cros sec 12mm Dia | m | 18.00 |
21.72 |
0460010 | Providing cork sheet/polysterene sheet in expansion joints of concrete works including supply of all materials etc. complete as per direction of Engineer in charge 25 mm thick sheet. | sqm | 148.00 |
181.94 |
0460020 | Provide Cork/Polysterene sheet in Expansion Joint-20mm thick | sqm | 131.00 |
161.08 |
0462010 | Filling of expansion joints upto a depth of 40 mm with bitumen mixed with coarse sand (FM>=2.5) in concrete works including supply of all materials etc. complete as per specification and direction of Engineer in charge. 25 mm wide. | m | 95.00 |
116.51 |
0462020 | Fill Expansion Joint with sand, bitumen-40mm depth-20mm wide | m | 76.00 |
93.25 |
0472040 | Hiring of Speed boat/Engine boat (With roof Cover, Life Jacket) in a tip top condition during travelling to different field offices or to different construction sites or any other official use, meeting, discussion or any other matters including driver (minimum 5 years of driving experience having valid driving license) maintenance complete of and necessary vehicle as per direction of Engineer in charge. | hr | 488.00 |
598.18 |
0472050 | Hiring of Engine Boat | hr | 308.00 |
377.31 |
0475010 | Cost of Fuel, Lubricant etc. for Speed Boat/Engine Boat with roof cover, life jacket for travelling to different field offices or to different construction sites or any other official use etc. complete as per direction of Engineer in charge. Speed Boat | hr | 3250.00 |
3987.84 |
0475020 | Cost of Fuel for Engine Boat | hr | 365.00 |
447.25 |
0480000 | 75mm thick brick work with 1st. class bricks in all kinds of works in cement mortar FM>=1.5) 1:3 (sand of including soaking bricks, raking out joints, staging, sorting, cleaning the surface curing at least the for 14 days including the cost of all materials etc. complete as per direction of Engineer in charge. | sqm | 715.00 |
876.96 |
0480500 | 125 mm thick jally brick work in cement mortar 1:4 (sand of FM>=1.50) including soaking bricks in clean water for 6 hours, cleaming the bricks, raking out joints, staging, sorting, cleaning the surface, curing at least for 14 days, including materials supply of all etc. complete for all floors as per direction of Engineer in charge. | sqm | 716.00 |
878.21 |
0481010 | Supplying wooden flap gates with pressure treated Sundari, Garjan, Shishu or equivalent timber .for regulator/ sluices, as per approved drawing, specification direction of Engineer in charge 0.75m dia to 1.20m dia with 40mm thick plank and 50mmx75mm batten. | each | 6903.00 |
8469.75 |
0481020 | Supply Treated Wood Flap Gate Above 1.20m dia with 50mm thick plank and 3 nos 50mmx75mm batten. | each | 11673.00 |
14323.56 |
0481500 | Supplying pressure treated wooden fall boards/stop logs of different sizes (not less than 15cm in depth) of sal, sundari, garjan, shishu or Carriage equivalent for regulator/ sluices, including fixing in position with eye hook etc. complete as per direction of Engineer in charge | cum | 83171.00 |
102053.43 |