RHD RATE SCHEDULE-2022 Updating.. | ||||
---|---|---|---|---|
Click on Code to see the analysis or Go Home | Profit=10%, Overhead=3.5%, VAT=5.5% | |||
04 | Preliminary and Misc. Work | |||
Code | Item | Unit | Cost(Tk.) | Unit Rate(Tk.) |
0418000 | Prepartion Site, remove soil-15cm | Sqm | 36.00 |
44.52 |
0420000 | Supply, fix Bamboo Gauge-6-9cm D | m | 102.00 |
124.89 |
0421010 | Supply, fix Wood Gauge 150x25mm | m | 627.00 |
769.47 |
0421020 | Supply, fix Wood Gauge 100x25mm | m | 466.00 |
571.98 |
0423000 | Supply,fix Triang Wood Gauge 15cm | m | 1265.00 |
1552.79 |
0424000 | Wood Gauge Post 2.8m 15-20cm, 1.8 | each | 1237.00 |
1517.62 |
0426000 | Fix Water Level Gauge to Balli Po | each | 249.00 |
305.66 |
0428010 | Concrett Gauge, Painting 150x25mm | m | 89.00 |
108.98 |
0428020 | Concrete Gauge, Painting 100x25mm | m | 61.00 |
74.28 |
0429000 | Repair Cement Concrete Gauge | m | 57.00 |
70.30 |
0431000 | Bamboo Sounding Rod 7.5cm D, 450m | each | 359.00 |
440.13 |
0432000 | Supp Bamboo Peg 6cm D, 0.45-0.75m | each | 33.00 |
41.03 |
0433000 | Fix Bamboo Peg 0.45-0.75 m Long | each | 4.00 |
4.59 |
0440010 | Water Hyacinth Remove-Scattered | sqm | 4.00 |
4.59 |
0440020 | Water Hyacinth Remove-Packed | sqm | 8.00 |
10.19 |
0441010 | Cut Tree, Uproot 30cm-1m Girth | each | 278.00 |
340.81 |
0441020 | Cut Tree, Uproot 1.0 -1.5 m Girth | each | 371.00 |
454.66 |
0441030 | Cut Tree, Uproot above 1.5m Girth | each | 963.00 |
1182.16 |
0444010 | Cut,Clear Uprooting Tree-Ordinary | sqm | 3.00 |
3.44 |
0444020 | Cut,Clear Uprooting Tree-Thick | sqm | 4.00 |
4.59 |
0445000 | Cut, Uproot, Remov Bamboo Cluster | sqm | 33.00 |
40.90 |
0446000 | Cut, Uproot, Remove Cane Jungle | sqm | 17.00 |
20.45 |
0447010 | Supply Nylon Rope Cross sec 6mm D | m | 167.00 |
205.07 |
0447020 | Supply Nylon Rope Cros sec 12mm D | m | 18.00 |
21.72 |
0460010 | Provide Cork sheet Expan Jnt-25mm | sqm | 148.00 |
181.94 |
0460020 | Provide Cork sheet Expan Jnt-20mm | sqm | 131.00 |
161.08 |
0462010 | Fill Expn Jnt sand,bitu-40mm-25mm | m | 95.00 |
116.51 |
0462020 | Fill Expn Jnt sand,bitu-40mm-20mm | m | 76.00 |
93.25 |
0472040 | Hiring of Speed Boat | hr | 488.00 |
598.18 |
0472050 | Hiring of Engine Boat | hr | 308.00 |
377.31 |
0475010 | Cost of Fuel for Speed Boat | hr | 3250.00 |
3987.84 |
0475020 | Cost of Fuel for Engine Boat | hr | 365.00 |
447.25 |
0480000 | 75mm Brick work (1:3), 1st Class | sqm | 715.00 |
876.96 |
0480500 | 125mm Jally Brick work (1:4) | sqm | 716.00 |
878.21 |
0481010 | Treatd Wood Flap Gate 0.75-1.2mD | each | 6903.00 |
8469.75 |
0481020 | Treatd Wood Flap Gate above 1.2mD | each | 11673.00 |
14323.56 |
0481500 | Supply Woodn Fall Board/ Stop Log | cum | 83171.00 |
102053.43 |