BREAKDOWN OF UNIT PRICE |
Item:1626010. Borrow Earth Riverbed 1km 85%Comp |
Basis:1cum | |
22.Misc-2 |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Diesel/ Fuel | 0.261 | ltr |
109.00 | |
|
|
Sub-Total(22) |
28.45
|
28.45
|
23.Misc-3 |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Lubricant (Mobil Oil) | 0.015 | ltr |
500.00 | |
|
|
Sub-Total(23) |
7.50
|
7.50
|
70.Equipment-0 |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
B.dozer/Roller/Comp:150HP | 0.001 | no. |
6900.00 | |
|
Cargo Truck (Ex Fuel,Lub) | 0.023 | no. |
5800.00 | |
|
|
Sub-Total(70) |
140.30
|
140.30
|
83.Labour-3a |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Head Man | 0.003 | no. |
800.00 | |
|
Labour, Unskill/ Ordinary | 0.435 | no. |
550.00 | |
|
Misc. Sundry-Lab Unskill/ | 0.004 | no. |
550.00 | |
|
|
Sub-Total(83) |
243.85
|
243.85
|
84.Labour-4 |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Operator, Dozer/Roler/Com | 0.001 | no. |
950.00 | |
|
|
Sub-Total(84) |
0.95
|
0.95
|
|
|
|
Total(1) |
|
421.05 |
|
Add over head on Total(1)
|
3.5 % |
14.74 |
|
Add Profit on Total(1) |
10.0 % |
42.10
|
|
|
|
Total(2) |
|
477.89 |
|
Add VAT on Unit Price |
7.5 % |
38.75 |
|
|
|
Unit Price |
|
516.64
|
|
|
|
Say |
520.67 |
per cum |