RHD RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
02 EARTHR_WORKS
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
020101 Clearing and Grubbing Sqm
52.00
62
020102A Remove and uproot trees of different girth measured one meter above ground level, if the tree is more than two-meter-high, falling within the Right of Way, and remove sub surface roots, transport and dispose off Site to Contractor’s tip. Trees with girth 300 mm to 800 mm Nos
880.00
1057
020102B Remove Trees with girth 801 mm to 1500 mm Nos
1460.00
1754
020102C Remove Trees with girth from 1501 mm and above Nos.
3520.00
4228
020201 Roadway Excavation in Unsuitable Soil Cubic Metre including stockpiling or disposal in a location agreed by Engineer Cum
186.00
223
020202 Roadway Excavation in Suitable Soil including stockpiling on Site Cum
131.00
157
020203A Roadway Excavation in Asphaltic Concrete by Milling Machine Cum
289.00
347
020203B Roadway excavation in Aggregate Base Cum
141.00
169
020203C Roadway excavation in sub base (Bricks Agg) Cum
141.00
169
020203D Roadway Excavation in Existing Reinforced Concrete Pavement Cum
1286.00
1545
020204A Deduction for Value of Roadway Excavationin Asphaltic Concrete Cum
3965.00
4762
020204B Deduction for Value of Roadway Excavation in Aggregate Base Cum
3053.00
3667
020204C Deduction for value of Roadway excavation in sub base (Bricks Agg) Cum
1455.00
1748
020204D Deduction for Value of Roadway Excavation in Suitable Soil Cum
207.00
249
020401 Channel Excavation in suitable/Unsuitable Materials Cum
199.00
239
020501 Excavation and Backfill for Structures Cum
423.00
508
020601A Embankment Fill From Suitable Roadway Excavation on Site Cum
131.00
157
020601B Embankment Fill from River Bed Materials Supplied by Contractors Own Arrangement Cum
334.00
401
020602 Sand Backfill to Swamp Cum
301.00
362
020603 Cladding Layer Cum
415.00
498
020604 Construction of Pore water release valve including supply of all materials and Labour as per drawings No.
4870.00
5849
020701 Preparation of subgrade surface (300 mm) excess. Item 2/6/1c will include the material and other cost Sqm
22.00
26
020801 Improved Subgrade Cum
949.00
1140
020901 Dismantling existing Structure (Box culvert/Pipe culvert/Bridge) including disposal of spoil and backfilling (Individual Structure to be stated in Bill of Quantities) Cum
3766.00
4523
020902 Cum
3571.00
4289
020903A Deduction of the Value of Recovered Materials (Except Reinforcing steel) from Structures Cum
943.00
1133
020903B Deduction of the Value of Recovered Materials(Reinforcing Steel) from Structures Ton
15020.00
18040
021001 Construction of Soil Earthen Shoulders Cum
190.00
228
021301 Provide dikes to cross-sectional area including dewatering as instructed Cum
377.00
453
021302 Supply and install 8-20 m long PVD drains as detailed design or instructed by the Engineer m
137.00
165
021303 Supply and Laying geo-textile fabric in accordance with drawings and specification Sqm
149.00
179
021304 Construction of vertical drain m
672.00
807
021305 Supply, install and monitoring settlement plates complete with rods at levels and locations as instructed no.
7661.00
9201
021306 Supply, install and monitoring VW piezometers no.
37900.00
45520
021307 Supply and apply of surcharge materials for stabilizing soft ground. (materials will be reused) Cum
180.00
216
021308A Secondary sub-soil investigation (including SPT, soil profile and classification, natural moisture content, shear (un-drained, and consolidated un-drained) and consolidation parameters Borehole 10-15m depth (Road and culvert) nos.
25100.00
30147
021308B nos.
35100.00
42157
021308C Borehole 75-90m depth (Bridge and Overpass) nos
370000.00
444392
021309 Supply and laying drainage blanket material in accordance with the drawings and specification Cum
2244.00
2695