RHD RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
030101 Scarify,Mix,Recompact Exist Pavme Sqm
35.00
42
030102 Repair Pothole Existing Pavement Cum
18378.00
22073
030201A Sub-base - Filter Layer Cum
4093.00
4916
030201B Sub-base-Drainage Layer Cum
4392.00
5275
030202A uPVC Perforated Pipe,GeoTex-150mm m
785.00
943
030202B uPVC Pipe-150mm dia m
619.00
743
030301 Aggregate Base Type II Cum
6951.00
8349
030302 Aggregate Base Type I Cum
7425.00
8918
030601A Bituminous Prime Coat-Plant Place Sqm
110.00
132
030701A Bituminous Tack Coat-Plant Work Sqm
44.00
53
031001A Base Course-DensBitumenPG64V(PMB) Cum
21920.00
26327
031001B Base Course-DEnsBitumenPG64H-Unmo Cum
19635.00
23583
031002A Wearing Cours-DensBitumnPG64V-PMB Cum
23372.00
28071
031002B Wearing Cours-DensBitumnPG64H-Unm Cum
20808.00
24992
031301 Brick on Ennd Edging-M/c Made-125 m
182.00
219
031302 Brick Flat Soling-Machine Made Sqm
513.00
616
031303 Herring Bond Brick-Machine Made Sqm
713.00
856
031401 Dry Lean Concrete-C20-Batching P Cum
12927.00
15526
031501 CC Pavement-C-40, Batching Plant Cum
14769.00
17738