RHD RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
020101 Clearing and Grubbing Sqm
52.00
62
020102A Remove Trees with Girth 300-800mm Nos
880.00
1057
020102B RemoveTrees with Girth 801-1500mm Nos
1460.00
1754
020102C Remove Trees with Girth =>1501 mm Nos.
3520.00
4228
020201 Roadway Excavation,Stockpil/Remov Cum
186.00
223
020202 Roadway Excavation Stockpile Site Cum
131.00
157
020203A Roadway Excavat Alphalt-Conc-Mill Cum
289.00
347
020203B Roadway Excavation Aggregate Base Cum
141.00
169
020203C Roadway Excavation Sub-base-Brick Cum
141.00
169
020203D Roadway Excavation RCC Pavement Cum
1286.00
1545
020204A Deduction-Excavation-Asphalt Conc Cum
3965.00
4762
020204B Deduction-Excavation-Aggregat Bas Cum
3053.00
3667
020204C Deduction-Excavation-SubBas-Brick Cum
1455.00
1748
020204D Deduction-Excavation-SuitableSoil Cum
207.00
249
020401 Channel Excavation in Suitable/Un Cum
199.00
239
020501 Excavation-Backfilling-Structure Cum
423.00
508
020601A Embankment from Roadway on Site Cum
131.00
157
020601B Embankment Fill from River Bed Cum
334.00
401
020602 Sand Backfill to Swamp Cum
301.00
362
020603 Cladding Layer Cum
415.00
498
020604 Pore Water Realease Valve Constru No.
4870.00
5849
020701 Subgrade Surface-200mm Sqm
22.00
26
020801 Improved Subgrade Cum
949.00
1140
020901 Dismantl Exist Structur, Disposal Cum
3766.00
4523
020902 Dismantl Exist Structur,Stockpili Cum
3571.00
4289
020903A Deduct-Recover Mat-ExSteelStruc Cum
943.00
1133
020903B Deduct-Recover Mat-RenfSteelStruc Ton
15020.00
18040
021001 Soil Earthen Shoulders Cum
190.00
228
021301 Dikes to Cross Sectional Area Cum
377.00
453
021302 PVD Drain: 8-20 m Long m
137.00
165
021303 Supply, Laying Geo-textile Fabric Sqm
149.00
179
021304 Construction of Vertical Drain m
672.00
807
021305 Sup, Inst, Monitor Settlment Plat no.
7661.00
9201
021306 Sup, Instl, Monitor VW Piezometer no.
37900.00
45520
021307 Surcharg Material-Stabliz Sof tGr Cum
180.00
216
021308A Subsoil Investigation-Bore-10-15m nos.
25100.00
30147
021308B Subsoil Investigation-Bore-30-50m nos.
35100.00
42157
021308C Subsoil Investigation-Bore-75-90m nos
370000.00
444392
021309 Sup,Lay Drianage Blanket Material Cum
2244.00
2695