BREAKDOWN OF UNIT PRICE
Item:050903B. Filling Granular Material behind
Basis:353cft
A1.Equipment
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Small hand tools (1)
4.000
day
60.00
240.00
Vibratory Roller (7-10 T)
0.500
day
11500.00
5750.00
Water Tanker
0.500
day
8000.00
4000.00
Dump Truck
0.250
day
11500.00
2875.00
Pay Loader
0.150
day
14000.00
2100.00
Sub-Total(A1)
14965.00
1496.50
B1.Labour
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mason
1.000
pers
700.00
700.00
Labour-Un-skilled
3.000
pers
540.00
1620.00
Sub-Total(B1)
2320.00
232.00
C1.Material
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand FM > 1.0
7.899
cum
730.00
5766.27
Brick Chips < 25mm
5.890
cum
3294.00
19401.66
Water
10.000
cum
13.00
130.00
Sub-Total(C1)
25297.93
2529.79
Total(1)
4258.29
Add over head on Total(1)
3.5 %
149.04
Add Profit on Total(1)
10.0 %
425.83
Total(2)
574.87
Add VAT on Unit Price
5.5 %
33.46
Unit Price
608.33
Say
608
per Cum