Return Main Menu
BREAKDOWN OF UNIT PRICE
Item:050708C. Steel Colum-Bracing-Padestrain Br
Basis:10000kg.
A1.Equipment
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mobile Genera/Welding m/c
6.000
day
4500.00
27000.00
Lifting Cran-Capacity 25T
0.250
day
46000.00
11500.00
Sub-Total(A1)
38500.00
3850.00
B1.Labour
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Welder
4.000
pers
700.00
2800.00
Labour-Skilled
4.000
pers
580.00
2320.00
Labour-Semi-skilled
4.000
pers
560.00
2240.00
Sub-Total(B1)
7360.00
736.00
C1.Material
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Steel Column i/c Bracing
10.000
ton
92000.00
920000.00
Electrode, other Accessor
2.220
LS
1150.00
2553.00
Sub-Total(C1)
922553.00
92255.30
Total(1)
96841.30
Add over head on Total(1)
3.5 %
3389.45
Add Profit on Total(1)
10.0 %
9684.13
Total(2)
13073.58
Add VAT on Unit Price
5.5 %
760.90
Unit Price
13834.47
Say
13834
per Ton