BREAKDOWN OF UNIT PRICE
Item:031501. CC Pavement-C-40, Batching Plant
Basis:100cft
A1.Equipment
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Poker Vibrator
0.170
day
700.00
119.00
Water Bowser for Curing
0.280
day
8000.00
2240.00
Water Pump with accessori
0.280
day
2300.00
644.00
Saw Cutter
0.150
day
2300.00
345.00
Pay Loader
0.050
day
14000.00
700.00
Batching Plant with Gener
0.050
day
46000.00
2300.00
Concrete Pump with Pipe
0.078
day
11500.00
897.00
Agitator Truck/Transit Mx
0.120
day
13800.00
1656.00
Sub-Total(A1)
8901.00
3143.01
B1.Labour
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Foreman
0.080
pers
850.00
68.00
Mason
0.500
pers
700.00
350.00
Labour-Semi-skilled
0.750
pers
560.00
420.00
Labour-Un-skilled
1.000
pers
540.00
540.00
Fixing and Remov Shutter
3.020
sqm
150.00
453.00
Sub-Total(B1)
1831.00
646.54
C1.Material
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand FM>1.8
1.270
cum
1300.00
1651.00
Cement - OPC
0.900
Ton
8800.00
7920.00
Crushed Boulder/Gravel<25
2.330
cum
7250.00
16892.50
High Yeld Stren-Dowel bar
24.500
kg
83.42
2043.79
Expansion Joint
1.000
LS
200.00
200.00
Diesel
10.000
ltr
109.00
1090.00
Wooden Shutter-use 6 time
4.000
sqm
200.00
800.00
Nail
0.500
kg
70.00
35.00
Admixture
2.200
litr
210.00
462.00
Sub-Total(C1)
31094.29
10979.63
Total(1)
14769.18
Add over head on Total(1)
3.5 %
516.92
Add Profit on Total(1)
10.0 %
1476.92
Total(2)
1993.84
Add VAT on Unit Price
5.5 %
116.04
Unit Price
2109.88
Say
2110
per Cum