BREAKDOWN OF UNIT PRICE
Item:031401. Dry Lean Concrete-C20-Batching P
Basis:100cft
A1.Equipment
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Poker Vibrator
0.170
day
700.00
119.00
Water Bowser for Curing
0.010
day
8000.00
80.00
Water Pump with accessori
0.010
day
2300.00
23.00
Pay Loader
0.050
day
14000.00
700.00
Batching Plant with Gener
0.050
day
46000.00
2300.00
Concrete Pump with Pipe
0.050
day
11500.00
575.00
Agitator Truck/Transit Mx
0.120
day
13800.00
1656.00
Sub-Total(A1)
5453.00
1925.50
B1.Labour
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Foreman
0.080
pers
850.00
68.00
Mason
0.160
pers
700.00
112.00
Labour-Semi-skilled
0.480
pers
560.00
268.80
Labour-Un-skilled
1.000
pers
540.00
540.00
Fixing and Remov Shutter
3.020
sqm
150.00
453.00
Sub-Total(B1)
1441.80
509.11
C1.Material
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand FM>1.8
1.270
cum
1300.00
1651.00
Cement - OPC
0.900
Ton
8800.00
7920.00
Crushed Boulder/Gravel<25
2.540
cum
7250.00
18415.00
Diesel
10.000
ltr
109.00
1090.00
Wooden Shutter-use 6 time
3.020
sqm
200.00
604.00
Nail
0.500
kg
70.00
35.00
Sub-Total(C1)
29715.00
10492.59
Total(1)
12927.20
Add over head on Total(1)
3.5 %
452.45
Add Profit on Total(1)
10.0 %
1292.72
Total(2)
1745.17
Add VAT on Unit Price
5.5 %
101.57
Unit Price
1846.74
Say
1847
per Cum