Return Main Menu
BREAKDOWN OF UNIT PRICE
Item:030601A. Bituminous Prime Coat-Plant Place
Basis:16146sft
A1.Equipment
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Small hand tools (1)
8.000
day
60.00
480.00
Water Tanker
0.130
day
8000.00
1040.00
Bitumen Heater
2.000
day
2300.00
4600.00
Bitumen Distrubutor
0.750
day
9200.00
6900.00
Tyre Roller PTR
0.130
day
7000.00
910.00
Air Blower/Power Brush
0.130
day
5800.00
754.00
Sub-Total(A1)
14684.00
9.79
B1.Labour
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Asplat Mistry
2.000
pers
800.00
1600.00
Labour-Semi-skilled
1.000
pers
560.00
560.00
Labour-Un-skilled
6.000
pers
540.00
3240.00
Sub-Total(B1)
5400.00
3.60
C1.Material
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Bitumen-60/70(Drum)
1.259
Ton
70000.00
88130.00
Kerosene
520.000
ltr
109.00
56680.00
Sub-Total(C1)
144810.00
96.54
Total(1)
109.93
Add over head on Total(1)
3.5 %
3.85
Add Profit on Total(1)
10.0 %
10.99
Total(2)
14.84
Add VAT on Unit Price
5.5 %
0.86
Unit Price
15.70
Say
16
per Sqm