BREAKDOWN OF UNIT PRICE
Item:020204A. Deduction-Excavation-Asphalt Conc
Basis:35cft
C1.Material
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Deduction-Stone-14mm
0.600
cum
6608.70
3965.22
Sub-Total(C1)
3965.22
3965.22
Total(1)
3965.22
Add over head on Total(1)
3.5 %
138.78
Add Profit on Total(1)
10.0 %
396.52
Total(2)
535.30
Add VAT on Unit Price
5.5 %
31.16
Unit Price
566.46
Say
566
per Cum