PWD RATE SCHEDULE-2018 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
29 TERMITE TREATMENT WORKS
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
2901 Supplying anti-termite chemicals named DURS BAN 20 EC / equivalent and mixing the same with pure water in required proportion (For DURSBAN 20 EC I Liter in 19 liters of pure water) and spraying the emulsified mixture @ 5 liters per square meter of soil surface by chemical sprayer or by any other means to the sides and bottom of the foundation trench and over plinth filling or floor bed accepted by the Engineer-in-charge. sqm
276.00
331