07 REINFORCED CEMENT CONCRETE (RCC) WORKS
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
070101 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.45 and minimum fcr = 26 MPa, satisfying a specified compressive strength fc= 19 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming to ASTM C-33 including conducting necessary tests, breaking chips and screening, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, elect ricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). Individual and combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum
8620.00
10353
070102 RCC (1:2:4),Brick,L/S.Sand-Pedestal, column, column capital, lift wall and wall up to ground floor cum
8942.00
10740
070103 RCC (1:2:4),Brick,L/S.Sand-Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and step etc. up to ground floor cum
8749.00
10508
070104 RCC (1:2:4),Brick,L/S.Sand-Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum
9263.00
11125
070201 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.40 and minimum fcr = 30.5 MPa, satisfying a specified compressive strength fc = 22 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (A ggregate grading as per table shown in technical specification), conducting necessary tests, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity,other charges etc. all complete, approved and accepted by the Engine er-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering) Individual and combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum
11979.00
14387
070202 RCC (1:2:4)-Stone-Pedestals, column, column capital, lift wall and RCC wall up to ground floor cum
12300.00
14773
070203 RCC (1:2:4)-Stone,S.sand-Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. upto ground floor cum
12107.00
14541
070204 RCC (1:2:4)-Stone-Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum
12621.00
15159
070301 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.5:3 having maximum water cement ratio = 0.40 and minimum fcr = 33.5 MPa, satisfying a specified compressive strength fc = 25 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper, fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is exc luding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the Individual and combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum
12451.00
14954
070302 RCC (1:1.5:3)-Pedestals, column, column capital, lift wall and RCC wall up to ground floor cum
12772.00
15340
070303 RCC (1:1.5:3)-Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. upto ground floor cum
12580.00
15109
070304 RCC (1:1.5:3)-Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum
13094.00
15727
070401 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.25:2.5 having maximum water cement ratio = 0.40 and minimum fcr = 40.5 MPa, satisfying a specified compressive strength fc = 32 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa)/ ASTM-C 150 Type-I, and adding approved high range water reducing admixture of complying specific type (generally be Type-G) under ASTM-C 494, best qualit y coarse sand [Sylhet sand or coarse sand of equivalent F.M. 2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), including conducting necessary tests, screening sand through proper sieves, making and placing shutter in position and maintaining true to plumb, making shutter water tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper and fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing cen tering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Doses of admixture to be fixed in consultation with design office) (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). Individual and combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum
12857.00
15442
070402 RCC (1:1.25:2.5)-Padestal, column, column capital, lift wall and RCC wall up to ground floor cum
13178.00
15828
070403 RCC (1:1.25:2.5)-Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. up to ground floor cum
12985.00
15596
070404 RCC (1:1.25:2.5)-Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum
13499.00
16213
070501 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1:2 having minimum fcr = 50 Mpa, satisfying a specified compressive strength fc = 40 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, Cement conforming to BDS EN-197-1-CEM I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I, and adding approved high range water reducing admixture of complying specific type (generally be Type-G) under ASTM-C 494, best quality coarse sand [Sylhet sand or coarse sand of equivalent F.M. 2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper and fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete approved and accepted by the Engineer-in-charge. (Doses of admixture to be fixed in consultation with design office) (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering) Individual and combined footing, pile cap, raft/mat and foundation beam up to plinth level cum
13483.00
16194
070502 RCC (1:1:2)-Column, Wall- GF cum
13804.00
16579
070601 Cast-in-place fair-faced concrete works with fcr=33.5 Mpa and fc=25 Mpa at 28 days on standard cylinders by using 75% of OPC and 25% of white cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2, 20 mm down and well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification) at mix ratio of 1:1.5:3, adding coloring pigment admixture (satisfying ASTM C979) as per architectural design, conforming to the standard practice of code ACI/BNBC/ASTM including conducting necessary tests, screening sand and chips through proper sieves, washing, making and placing shutter in position maintaining true to plumb, making shutter water tight properly, placing reinforcement in position, including pouring of concrete in form, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. For column, wall, beam, slab, drop wall, cornice etc. up to ground floor cum
15142.00
18186
070701 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum fcr = 33.5 MPa, satisfying a specified compressive strength fc = 25 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C- 33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturers Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 385 kg/ cum), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). (Foundation to 4th floor) Note: The mix design shall be do ne from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum
13349.00
16033
070702 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum fcr = 40.5 MPa, satisfying a specified compressive strength fc = 32 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C- 33 (Aggregate grading as per table shown in technica l specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturers Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 445 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using li ne pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum
13819.00
16597
070703 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum fcr = 50 MPa, satisfying a specified compressive strength fc =40 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C- 33 (Aggregate grading as per table shown in tec hnical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturers Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 500 kg/ cum), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in f orms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum
14196.00
17050
070704 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum fcr = 60 MPa, satisfying a specified compressive strength fc =50 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C- 33 (Aggregate grading as per table shown in tec hnical specification), High-range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturers Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content (minimum 500 kg/ cum) and micro silica (minimum 25 kg/ cum) as per approved design mix, including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum
16202.00
19460
070801 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum fcr = 33.5 MPa, satisfying a specified compressive strength fc = 25 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C- 33 (Aggregate grading as per table shown in apppendix ), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturers Guideline) making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 385 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using l ine pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). (Foundation to 4th fl oor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum
12759.00
15324
070802 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum fcr = 40.5 MPa, satisfying a specified compressive strength fc = 32 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C- 33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturers Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 445 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using lin e pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum
13229.00
15889
070803 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum fcr = 50 MPa, satisfying a specified compressive strength fc = 40 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C- 33 (Aggregate grading as per table shown in tech nical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturers Guideline) making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 500 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using li ne pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). (Foundation to 4th flo or) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum
13606.00
16342
070804 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum fcr = 60 MPa, satisfying a specified compressive strength fc = 50 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type-I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C- 33 (Aggregate grading as per table shown in tech nical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturers Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content (minimum 500 kg/ cum) and micro silica (minimum 25 kg/ cum) as per approved design mix, carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum
15611.00
18750
070805 Reinforced cement concrete works for thick mat foundation from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum fcr = 33.5 MPa, satisfying a specified compressive strength fc = 25 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to CEM-II/B-M 42.5N (42.5MPa), best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table sh own in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturers Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 400 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of conc rete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity,cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). (Foundation: MAT) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum
12766.00
15333
070806 Reinforced cement concrete works for thick mat foundation from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum fcr = 40.5 MPa, satisfying a specified compressive strength fc = 32 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to CEM-II/B-M 42.5N (42.5MPa), best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table sh own in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturers Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 460 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of conc rete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering). (Foundation: MAT) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum
13229.00
15889
070901 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.25:2.5 having minimum fcr = 38.5 MPa, satisfying a specified compressive strength fc = 30 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, Cement conforming to CEM-II/B- M 42.5N (42.5MPa), and adding approved high range water reducing admixture of complying specific type (generally be Type-G or F) under ASTM-C 494, best quality coarse sand [Sylhet sand or coarse sand of equivalent F.M. 2.2], 20 mm down wel l graded crushed stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), including conducting necessary tests, screening sand through proper sieves, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper and fed by standard measuring boxes or in batching plant, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering afte r specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Doses of admixture to be fixed in consultation with design office) (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering and centering) Individual and combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum
13404.00
16099
070902 RCC-30Mpa (1:1.25:2.5)-Saline Zone-Padestal, column, column capital, lift wall and RCC wall up to ground floor cum
13725.00
16485
070903 RCC-30Mpa (1:1.25:2.5)-Saline Zone-Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. up to ground floor cum
13232.00
15892
070904 RCC-30Mpa (1:1.25:2.5)-Saline Zone-Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum
13745.00
16509
0710 Added rate for RCC works/fair-faced concrete works (materials, consumables and laying/placing concrete) in column, column capital, lift wall and wall, T- beam, L-beam, rectangular beams, floor / roof slab, cantilever slab, waffle slab and drop panels where the free height of the structure exceeds 4 meter (rate is considered for each additional meter height) cum
313.00
376
071101 Added rate for RCC work/fair-faced work in additional floor: concrete cum
83.00
100
0711021 Added rate for RCC work in additional floor: concrete (concrete from batching or Ready-Mix Plant) Add for each cum of concrete from 5th floor to 14th floor: cum
15.00
18
0711022 RCC-RMC-with pump-Add for each cum of concrete above 15th floor: cum
38.00
46
071201 Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 16 BWG, angles of minimum size 40 mm x 40 mm x 5 mm, flat bars etc.) and removal of form for Individual and combined footing sqm
472.00
567
071202 Formwork (Steel)-In raft/mat/floor slab up to plinth level sqm
476.00
572
071203 Formwork (Steel)-Foundation beam sqm
406.00
488
071204 Formwork (Steel)-Pedestal, column, column capital, lift wall and wall up to ground floor sqm
423.00
508
071205 Formwork (Steel)-Tie beam and lintel: ground floor sqm
440.00
528
071206 Formwork (Steel)-T-beam, L-beam and rectangular beam etc up to ground floor sqm
459.00
551
071207 Formwork (Steel)-Floor and roof slab up to ground floor sqm
486.00
584
071208 Formwork (Steel)-Cornice, railing, drop walls, louver, fins etc.: ground floor sqm
394.00
473
071209 Formwork (Steel)-Sunshade, false ceiling: ground floor sqm
438.00
526
071210 Formwork (Steel)-Stair case slab and steps up to ground floor sqm
446.00
536
071211 Formwork (Steel)-Waffle or ribbed floor upto ground floor sqm
576.00
692
0712121 Formwork (Steel)-Arches, domes, vaults up to 8m span (for single use) sqm
1747.00
2098
0712122 Formwork (Steel)-Arches, domes, vaults-Arches, domes, vaults up to 8 m span (for 2-times use) sqm
1223.00
1469
0712123 Formwork (Steel)-Arches, domes, vaults up to 8 m span (for 3-times use) sqm
874.00
1050
0712124 Formwork (Steel)-Arches, domes, vaults up to 8 m span (for more than 3-times use) sqm
612.00
735
0713 Formwork (Steel)-Added rate for shuttering in circular work sqm
437.00
525
0714 Formwork (Steel-Added rate for shuttering in circular work sqm
94.00
113
0715 Formwork (Steel)-Added rate for additional height in centering, shuttering where ever required with adequate bracing, propping etc. over a height of 4.0 m, for every additional height of 1 meter or part thereof. sqm
46.00
55
0716 Added rate for formwork/shuttering in additional floor sqm
16.00
19
0717 Formwork for making fair-faced surface of the concrete as per design, drawing and direction of Engineer-in-charge. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 10 BWG, angles of minimum size 50 mm x 50 mm x 6 mm, flat bars, formwork releasing agent etc.) sqm
904.00
1086
071801 FORMWORK (Wooden) for boundary wall, gate, centry post etc. Centering and shuttering, including strutting, propping etc. and removal of form for: Individual and combined footings sqm
426.00
512
071802 Formwork (Wood) - Foundation beam sqm
387.00
465
071803 Formwork (Wood) - Padestals, column, wall sqm
424.00
509
071804 Formwork (Wood) - Tie beam and lintels sqm
430.00
516
071805 Formwork (Wood)-T-beam, L-beam and rectangular beam sqm
421.00
506
071806 Formwork (Wood) - Floor and roof slab sqm
472.00
567
071807 Formwork (Wood) -Cornice, railing, drop wall, louver, fins etc. sqm
374.00
449
071808 Formwork (Wood) - Sunshade, false ceiling sqm
449.00
539
071809 Formwork (Wood) - Stair case slab and steps sqm
431.00
518
071901 Supply and use of specified type chemical admixture delivered from an authorized local agent or manufacturer, complying with the ASTM C-494 requirements; conforming the current compliance of the admixture to specification requirements like physical properties, uniformity and equivalence in composition etc.; performance (water content, fresh concrete setting time and compressive strength) requirements, delivered in sealed water-tight containers confirming plainly marked product name and type under this specification, net weight and /or volume, manufacturing and expiry date, non aggressiveness to environment, aggregates and metals in concrete etc. and mixing the admixture in non pre-stressed cement concrete mixture in the field in accordance with manufacturers recommendation and instruction; providing safety provisions in all respects etc. all complete as per instruction and approved by the Engineer-in-charge. Dose (quantity in milli litres per 50 kg bag cement) and brand/origin/ manufacturer with respect to particular brand of cement and particular stock of aggregates and method of use to be determined by mix design / trial mix at the cost of contractor and approved by the Engineer. (Use of admixture is subjected to prior approval of design office) Supply and use of water reducing chemical admixture in concrete, complying ASTM C-494 Type-A of approved brand / origin / manufacturer and supplied by only manufacturers authorised dealer with certificate of origin. The admixture is to reduce quantity of mixing water required for normal workability and to maintain low water-cement (W/C) ratio, for improved concrete quality assurance. litr
168.00
202
071902 Supply and use of retarding chemical admixture in concrete, complying ASTM C-494 Type - B of approved brand/origin/manufacturer and supplied by only manufacturers authorised dealer with certificate of origin. The admixture for retarding setting time of concrete, there by reducing shrinkage in concrete specially for concrete laid in thick layers and intended delayed construction for improved construction joints, re-concreting etc. litr
170.00
204
071903 Supply and use of accelerating chemical admixture in concrete, complying ASTM C-494 Type - C of approved brand/origin/manufacturer and supplied by only manufacturers authorised dealer with certificate of origin. An admixture that is to accelerate the setting time and early strength gain of concrete. litr
120.00
144
071904 Supply and use of water-reducing and retarding chemical admixture in concrete, complying ASTM C- 494 Type - D of approved and/origin/manufacturer and supplied by only manufacturers authorised dealer with certificate of origin. The admixture to reduce the quantity of mixing water required to produce concrete of given consistency, i.e. low water-cement (W/C) ratio and intend to retard setting time of concrete, specially for layered, thick laid concrete etc. litr
220.00
264
071905 Supply and use of water-reducing and accelerating chemical admixture in concrete, complying ASTM C-494 Type - E of approved brand/origin/manufacturer and supplied by only manufacturers authorised dealer with certificate of origin. The admixture to reduce the quantity of mixing water required to produce concrete of given consistency, i.e. low water-cement (W/C) ratio and intend to accelerate setting time of concrete, and early strength gain in concrete etc. litr
190.00
228
071906 upply and use of water-reducing high range chemical admixture in concrete, complying ASTM C- 494 Type - F of approved brand/origin/manufacturer and supplied by only manufacturers authorised dealer with certificate of origin. The admixture required to produce concrete of consistency by 12% or greater (flowing concrete) and for higher strength of concrete. litr
220.00
264
071907 Supply and use of water-reducing high range and retarding chemical admixture in concrete, complying ASTM C-494 Type - G of approved brand/origin/manufacturer and supplied by only manufacturers authorised dealer with certificate of origin. The admixture required to produce concrete of consistency by 12% or greater (flowing con litr
165.00
198
072001 Supply and use of best quality pliable, cold applied pre-formed self adhesive rubberized/ bituminous water proofing membrane of approved brand / origin / manufacturer from an authorized local agent or manufacturer having minimum thickness 1.5 mm, lined with 2 ply cross laminated high density polyethylene film performances and properties all conforming to ASTM standards and laying, placing, fixing on made up firm and dry surfaces free from hollows, sharp protrusions, contaminates etc. laid o ver-lap by at least 75 mm along the edges and 125 mm at ends ensuring good initial bond with the surfaces all complete under the strict accordance with the manufacturer recommendations and instructions providing all safety provisions in all respects and accepted by the Engineer. (supplied by only manufacturers authorised dealer with certificate of origin) under following specification: Water-proofing membrane on external surface of primed vertical or inclined wall /on plastered and primed back-wall and concrete cast against membrane. (Excluding cost of back fill/brick wall on back/plaster when membrane laid on back-wall and concrete cast against membrane which to be paid as per corresponding items in this schedule) sqm
904.00
1086
072002 Water-proofing membrane on made up surface below the floor or below the horizontal surfaces with temporary protective cover using polystyrene/38 mm thick sand-cement mortar in 4:1 /or by equally effective alternative. (Rate is excluding the cost of protective cover which to be paid as per corresponding items in this schedule) sqm
740.00
889
072003 Water-proofing membrane on the floor or on the horizontal surfaces with permanent protective cover and wearing coarse. (Rate is excluding the cost of protective cover and wearing coarse which to be paid as per corresponding items in this schedule) sqm
769.00
924
0721 Supply of polymer based curing compound as per ASTM C 309 or BS 7542-1992 standard and apply by stirring and spraying with motorized sprayers over the surface of fresh concrete free from surface water and avoiding bleeding of concrete maintaining the spray nozzle approximately 450 mm away from the concrete surface with passed back and forth to ensure complete coverage confirming the pump pressure for fine spray and keeping the concrete surface undisturbed until it has sufficient strength to bear surface loads [The suitability of motorize d sprayer should be ensured by an application trial] ensuring adequate ventilation to avoid inhalation of vapors and contact with skin and eyes all complete and accepted by Engineer-in-charge. sqm
183.00
220
0722 Supply of epoxy bonding agent following ASTM C881 / C881M - 14 or any international acceptable standard and apply over the old concrete surface after making free of standing water, removal of dust, laitance, grease, curing compounds, impregnations, waxes and any other contaminants to achieve optimum bonding in between fresh and old concrete and accepted by the Engineer-in-charge. sqm
897.00
1077
0723 Supply of best quality salt guard coating on concrete surface following ASTM B117 delivered from authorized local agent of the manufacturer in a sealed container and apply by a firm experienced in applying salt guard coating or workers trained and approved by manufacturer to wall and ceiling in 2 coats elapsing specified time for drying/ recoating including cleaning and sand papering making the surface free from loose and efflorescence, flaky materials, dirt, grease, wax, polish, scraping all chalked and scaled materials, applying the paint by brush/spray following manufacturers written instructions and necessary scaffolding etc. all complete and accepted by the Engineer-in-charge sqm
427.00
513
0724 Supplying, fitting and fixing of 0.45mm thick foreign made celulloid paper for fair face form works to add extra smoothness in surface applying in shutter top with liquid glue etc of celluloid paper and other materials, electricity, accessories, labour for installation, scaffolding, screws, nails etc. all complete as per design, approved and accepted by the engineer in charge. sqm
183.00
220