01 GENERAL, SITE FACILITIES AND SAFETY
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
010101 Erection and maintenance of semi permanent site office and removal of the same after completion of work in accordance with the conditions of contract. In addition to the office required for own use, the contractor shall provide and maintain furnished site office for the use of Engineer-in-charge and his staff. The site office must have tiles floor, adequate foundation, brick walls, false ceiling of gypsum board and all windows are to be glazed, shuttered and provided with steel grill. Outside and inside wall surface are to be painted on plast er acceptable to the Engineer-in-charge Engineers site office of minimum 10 sqm plinth area with providing necessary facilities including office job
41000.00
49243
010102 Engineers site office of minimum 15 sqm plinth area with providing necessary facilities including office furniture, consumables, stationeries, water purifier etc. job
65500.00
78669
010103 Engineers site office of minimum 38 sqm plinth area with providing necessary facilities including office furniture, 24000 BTU air cooler, umbrella, crookeries, water purifier, PC with monitor, uninterruptible power supply (UPS), laserjet printer (minimum 20 ppm), LED flood light fittings(Halogen) for sight security etc job
397000.00
476820
0101041 Providing necessary facilities in construction site for maintaining site safety of 30 nos construction worker including safety helmet, safety belt , apron, gumboot, goggles etc. set
31500.00
37833
0101042 Providing necessary facilities in construction site for maintaining site safety of 10 nos construction inspection team member including safety helmet, safety goggles, safety shoe etc. set
8800.00
10569
0101043 Supplying and providing of first aid box with necessary materials/medicine (hygienic gown, thermometer, adhesive dressings, antiseptic solutions, bandages, cotton balls or swaps, emergency blanket, gloves, hand sanitizer, ice pack, saline etc ). All complete as per direction of Engineer-in -charge. each
13215.00
15872
0101044 Hiring, installation, testing commissioning of CCTV/Surveillance facilities for monitoring construction site including supply, fixing of 5.0 megapixel IR fixed bullet network IP camera including lens, bracket, housing with outdoor night vision facilities, full HD 1080 pixel, real time video, network video recorder (NVR) , 2 TB HDD for NVR , 4/8/16/32 port PoE switch, 32 /42 inch Full HD CCTV monitor, cable, accessories, internet connection with operation, maintenance cost throughout contract completion period, re-fitting , re-fixing with progress of construction all complete as per direction of Engineer in charge. job
40000.00
48042
010105 Providing and maintenance one project profile signboards to be placed at a suitable place of the site including submission of proposals for the materials of the signboards and text layout containing 3D picture, safety instructions, project information with security light etc to the Engineer-in-charge for approval which will be positioned as directed by the Engineer-in-charge and removing the same on completion of the works or as instructed by the Engineer-in-charge. sqm
2691.00
3232
010201 Providing 3 sets as-built drawings subject to Engineers approval produced in AutoCAD software in 584.5 mm x 413.5 mm (A-2 size) standard drawing paper, and operating and maintenance manual of the equipment and plant incorporated in the works, if any, in original by the date stated in the particular conditions of contract (PCC). If the contractor does not supply the as-built drawings and operating, maintenance manuals by the date stated in the particular conditions of contract (PCC), or they do not receive the Engineer-in-charges approval, the Engineer-in-charge shall withhold the amount stated in the PCC from the payments due to the contractor. The as-built drawings must show the permanent works as actually constructed and reflect the revision of drawings supplied to the contractor during the Contract as well as revisions of drawings supplied to the contractor during the contract. (One set of as-built drawings shall be considered for measurement and payment) tend
23028.00
27658
010202 Providing additional copy of as-built drawing produced in AutoCAD software in 584.5 mm x 413.5 mm (A-2) standard drawing paper accepted by the Engineer-in-charge. sqm
270.00
324
010301 Providing coloured progress picture, video of works, CCTV monitoring system operation and related data processing, regular data updating, all other relevent works regarding online monitoring system etc. mon
26485.00
31810
010401 Preparation, submission of work programme / schedule to the Engineer-in-charge for approval prior ground breaking showing the events (works) and successive sub-events of works including all the management, control parameters like Earliest Start Time (EST), Earliest Finish Time (EFT), float events on critical path, resource allocation etc. with description of general method of works, in orderly manner all in the form of network diagram prepared in computer software like MS project/ Primavera and presenting in displayable h ard and soft copy minimum 3 (three) sets. (This is a time related item. Proportionate payment for this item shall be made distributing in each bill on the basis of percentage progress of the whole works under contract) tend
26142.00
31398
010402 Updating the work programme and submission to the Engineer-in-charge at intervals no longer than 28 days showing actual physical and financial progress achieved on each activity and the effect of the progress on the timing of the remaining work, including any changes to the sequence of the activities.However, Engineers approval of the programme shall not alter the contractors obligations. The contractor may revise the programme and submit it to the Engineer-in-charge again at any time. A revised prog ramme shall show the variations and events related to change of contract price. Month wise documentation shall be the basis of payments on this item. rev
7742.00
9299
0105 Providing all necessary logistic support to frame monthly progress meeting between contractor/contractors representatives and employer / employers representatives at the Engineer-in- charges office at site. Month wise documentation shall be the basis of payments on this item. mon
2000.00
2402
0106 Providing layout and carry over PWD bench-mark (BM) at site from nearby BM pillar, property lines, existing ground level (EGL), formation ground level (FGL), highest flood levels (HFL), plinth levels (PL), mean sea level (MSL), setting and marking all pillars, marker, pegs etc. showing and maintaining reduced levels (RLs) including locating, establishing, protecting all public utilities within the premise of work and finally all to be presented in black and white. sqm
27.00
32
0107 Mobilization and cleaning site before commencing actual physical work and during contract period and demobilization after completion of the works under contract to be accepted by the Engineer-in-charge. This work shall also cover cleaning and clearing, cutting or filling, dressing the project area on and in the ground to an extent that all the events of works of the project can be executed smoothly in a working environment with a particular attention on safety and security in all respects, and to stockpile the end outcome to a place for disposal agreed by the Engineer-in-charge, where, payments are to be based on ground area determined by the Engineer-in-charge and be proportionate to the percentage progress of work under contract as a whole in all respects and approved by the Engineer-in-charge. sqm
178.00
214
0108 Providing expertised architect having minimum qualification Bachelor of Architecture and relevant experience(s) more than 5 years with registration in respective professional body for detail documentation of architectural themes, drawings, working out shop drawings, communication with theme architect and getting approval, specifying architectural needs according to approved master architectural themes and plan, certifying as built drawing for the approval etc. and any relevant jobs assigned by the HOPE or his official at site (max man month not greater than 1/4 of initial contract duration or contract completion time whichever is less and payment for the item subject to submission of CV and approved by HOPE or his authorized officer). mon
65198.00
78307
0109 Providing expertised engineer having B.Sc. in Civil Engineering and relevant experience (s) more than 10 years, with registration in respective professional body for the project documentation, progress study and adjustment, preparation of project material schedule and testing schdule for approval etc. and jobs assigned by the HOPE or his official, at site (max man month not greater than 1/4th of Project duration andpayment for the item subject to submission of CV and approved by HOPE or his authorized officer. mon
97797.00
117460
0110 Providing transport facilites for quality control part of project wich inchudes carrying test samples,work samples and emergency services of roject including cost of fuel, driver, maintenace etc. (Total duration is 1/2th the initial contrac duration or cntract completion time whichever is less of.) mon
57048.00
68518
011101 Supplying, fitting, fixing, operating and maintenance of the construction supervision lift (1000Kg capacity) for supervision of building construction work during the entire construction period including all necessary components like, steel frame, car, guide rails. push button, driving motor, gear box, car door, travelling cable, RCC base for steel frame, necessary connections with the building, electric supply, electricity bill and dismantling the same after completion of the building construction etc. all complete complying all safety factors and accepted by the Engineer-in-charge. (The construction supervision lift shall be the contractor property after completion of work). Number of month shall be calculated as 1/2 (half) of the initial contract period or contract completion time whichever is less for new construction and full contract period for vertical extension work. The contractor must submit detail structural drawing of supporting frame with foundation and lift specification prior to supply on site 6th to 9th floor, hoisting speed 40 m/min mon
14449.00
17354
011102 Supervision Lift 10th to 14th floor, hoisting speed 40 m/min mon
17497.00
21015
011103 Super vision Lift 15th to 19th floor, hoisting speed 50 m/min mon
20499.00
24620
011104 Supervision Lift 20th to 24th floor, hoisting speed 60 m/min mon
23757.00
28534
011105 Supervision Lift 25th to 29th floor, hoisting speed 60 m/min mon
26420.00
31732