PWD RATE SCHEDULE-2022 Updating.. | ||||
---|---|---|---|---|
Click on Code to see the analysis or Go Home | Profit=10%, Overhead=3.5%, VAT=5.5% | |||
30 | CONCRETE SOLID AND HOLLOW BLOCKS, FACING, PAVING STONES ETC. | |||
Code | Item | Unit | Cost(Tk.) | Unit Rate(Tk.) |
3037031 | AAC Block Wall-600x200x150-150 | cum | 6150.00 |
7387 |
3037032 | AAC Block-Add each floor above GF | cum | 69.00 |
83 |