PWD RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
30 CONCRETE SOLID AND HOLLOW BLOCKS, FACING, PAVING STONES ETC.
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
3037031 AAC Block Wall-600x200x150-150 cum
6150.00
7387
3037032 AAC Block-Add each floor above GF cum
69.00
83