PWD RATE SCHEDULE-2022 Updating.. | ||||
---|---|---|---|---|
Click on Code to see the analysis or Go Home | Profit=10%, Overhead=3.5%, VAT=7.5% | |||
24 | ROAD AND PAVEMENT WORKS | |||
Code | Item | Unit | Cost(Tk.) | Unit Rate(Tk.) |
240101 | Earthwork Road Embankmn upto 1.5m | cum | 179.00 |
220 |
240102 | Earthwork Road Embankmen 1.5-2.5m | cum | 204.00 |
250 |
240103 | Earthwork Road Embankmen 2.5-3.5m | cum | 229.00 |
281 |
240104 | Earthwork Road Embankmen 3.5-4.5m | cum | 255.00 |
313 |
240105 | Earthwork Road Embankmen 4.5-5.5m | cum | 280.00 |
344 |
240106 | Earthwork Road Embankmen 5.5-6.5m | cum | 306.00 |
375 |
240201 | Earthwork in Box cutting upto 300 | sqm | 59.00 |
72 |
240202 | Earthwork in Box cutting upto 450 | sqm | 88.00 |
108 |
2403 | Turfing Side Slope, Top of Embank | sqm | 17.00 |
21 |
240401 | Single Brick Flat Soling | sqm | 543.00 |
666 |
240402 | Concrete Solid Block Soling | sqm | 134.00 |
164 |
240501 | Brick on End Edge Pavement in HBB | sqm | 870.00 |
1068 |
240502 | HBB with Concrete Solid Block | sqm | 224.00 |
275 |
2406 | Double Brick Flat Soling | sqm | 1094.00 |
1342 |
240701 | Berick on End Edging | metr | 137.00 |
168 |
240702 | Berick on End Edging Solid Block | metr | 39.00 |
48 |
240801 | Breaking of Picked, Brick-62-40mm | cum | 4344.00 |
5330 |
240802 | Breaking of Picked, Brick-40-25mm | cum | 4556.00 |
5590 |
2409 | Water Bound Macadam Base Course | cum | 5398.00 |
6623 |
241001 | Compacted Sub-base Course | cum | 5064.00 |
6214 |
241002 | Improved Subgrade | cum | 716.00 |
879 |
241003 | Agrregate Base Type-I | cum | 1308.00 |
1605 |
241004 | Agrregate Base Type-I with Paver | cum | 1308.00 |
1605 |
241005 | Aggregate Base Type-II | cum | 5485.00 |
6730 |
241006 | Agrregate Base Type-II with Paver | cum | 5485.00 |
6730 |
2411 | Bituminous Carpeting -50 mm | sqm | 472.00 |
579 |
2412 | Bituminous Carpeting -38 mm | sqm | 387.00 |
475 |
2413 | Bituminous Carpeting -25 mm | sqm | 253.00 |
310 |
2414 | Dense Bituminous Carpeting -38 mm | sqm | 371.00 |
455 |
2415 | Dense Bituminous Carpeting -25 mm | sqm | 231.00 |
283 |
2416 | Premixed Dense Bituminous Carpeti | cum | 8770.00 |
10761 |
2417 | Tack Coat @ 750 kg per 10 sqm | sqm | 28.00 |
34 |
241801 | Seal Coat with Sand (FM 2.2) | sqm | 54.00 |
66 |
241802 | Premixed bituminous Seal Coat | sqm | 72.00 |
88 |
241901 | Prime Coat @1.2L/m2 by Hand Devic | sqm | 11.00 |
13 |
241902 | Prime Coat @1.2L/m2 by Mech Distr | sqm | 10.00 |
12 |
2420 | Road Marking-two coats | sqm | 267.00 |
328 |
2421 | Expansion Joint in RCC Road | metr | 296.00 |
363 |
2422 | Stamped Concrete | sqm | 315.00 |
387 |