PWD RATE SCHEDULE-2022 Updating.. | ||||
---|---|---|---|---|
Click on Code to see the analysis or Go Home | Profit=10%, Overhead=3.5%, VAT=5.5% | |||
17 | LIME TERRACING, ROOF TOP WATER PROFFING FOR GARDEN & SWIMMIN | |||
Code | Item | Unit | Cost(Tk.) | Unit Rate(Tk.) |
170101 | Polymer Cemetwater proofing-1.5mm | sqm | 761.00 |
914 |
1701021 | Waterproofing roof without mesh | sqm | 905.00 |
1087 |
1701022 | Waterproofing roof with fibermesh | sqm | 1008.00 |
1211 |
1702 | Gravel Pack with pea-gravel | cum | 4194.00 |
5037 |
1702011 | Gravel pack Addl floor | cum | 159.00 |
191 |
1703 | Waterproof plaster on roof top | sqm | 1115.00 |
1339 |
1704 | Lime Terracing (7:2:2) -100mm | cum | 15568.00 |
18698 |
1704011 | Lime Terracing addl floor | cum | 106.00 |
127 |
170501 | Ferrocement Treatment-Waterprof | sqm | 1337.00 |
1606 |
170502 | Ferrocement for Heat-Waterproofin | sqm | 1784.00 |
2143 |