PWD RATE SCHEDULE-2022 Updating.. | ||||
---|---|---|---|---|
Click on Code to see the analysis or Go Home | Profit=10%, Overhead=3.5%, VAT=5.5% | |||
08 | M.S. FABRICATION AND JOINTS IN RC WORKS | |||
Code | Item | Unit | Cost(Tk.) | Unit Rate(Tk.) |
080101 | MS Deformed Bar-Grade- 300 | ton | 75200.00 |
90320 |
080102 | MS Deformed Bar-Grade- 400 | ton | 97420.00 |
117007 |
080103 | MS Deformed Bar-Grade- 500 | ton | 111055.00 |
133384 |
0802 | MS Deformed Bar-Add each floor | ton | 596.00 |
716 |
080301 | Thread Coupler-20 mm Bar | each | 262.00 |
315 |
080302 | Thread Coupler-25 mm Bar | each | 417.00 |
501 |
080303 | Thread Coupler-32 mm Bar | each | 599.00 |
719 |
080401 | Press Coupler-16 mm dia bar | each | 314.00 |
377 |
080402 | Press Coupler-20 mm dia bar | each | 433.00 |
520 |
080403 | Press Coupler-22 mm dia bar | each | 550.00 |
661 |
080404 | Press Coupler-25 mm dia bar | each | 707.00 |
849 |
080405 | Press Coupler-32 mm dia bar | each | 1188.00 |
1427 |
080501 | PVC Water stopper-non centre bulb | metr | 858.00 |
1031 |
080502 | PVC Water stopper-centre bulb | metr | 927.00 |
1113 |
0806 | Alum Water stopper-RCC vertical | metr | 313.00 |
376 |
080701 | Expansion Joint upto 100 mm | metr | 6044.00 |
7259 |
080702 | Expansion Joint upto 100-150mm | metr | 7103.00 |
8531 |
080703 | Expansion Joint upto 150-200mm | metr | 8163.00 |
9804 |