08 M.S. FABRICATION AND JOINTS IN RC WORKS
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
080101 MS Deformed Bar-Grade- 300 ton
75200.00
92272
080102 MS Deformed Bar-Grade- 400 ton
97420.00
119537
080103 MS Deformed Bar-Grade- 500 ton
111055.00
136267
0802 MS Deformed Bar-Add each floor ton
596.00
731
080301 Thread Coupler-20 mm Bar each
262.00
321
080302 Thread Coupler-25 mm Bar each
417.00
512
080303 Thread Coupler-32 mm Bar each
599.00
735
080401 Press Coupler-16 mm dia bar each
314.00
385
080402 Press Coupler-20 mm dia bar each
433.00
531
080403 Press Coupler-22 mm dia bar each
550.00
675
080404 Press Coupler-25 mm dia bar each
707.00
868
080405 Press Coupler-32 mm dia bar each
1188.00
1458
080501 PVC Water stopper-non centre bulb metr
858.00
1053
080502 PVC Water stopper-centre bulb metr
927.00
1137
0806 Alum Water stopper-RCC vertical metr
313.00
384
080701 Expansion Joint upto 100 mm metr
6044.00
7416
080702 Expansion Joint upto 100-150mm metr
7103.00
8716
080703 Expansion Joint upto 150-200mm metr
8163.00
10016