PWD RATE SCHEDULE-2022 Updating.. | ||||
---|---|---|---|---|
Click on Code to see the analysis or Go Home | Profit=10%, Overhead=3.5%, VAT=7.5% | |||
07 | REINFORCED CEMENT CONCRETE (RCC) WORKS | |||
Code | Item | Unit | Cost(Tk.) | Unit Rate(Tk.) |
070101 | RCC (1:2:4),Brick,L/S.Sand-Footin | cum | 8620.00 |
10577 |
070102 | RCC (1:2:4),Brick,L/S.Sand-Pades | cum | 8942.00 |
10972 |
070103 | RCC (1:2:4),Brick,L/S.Sand-Slab-G | cum | 8749.00 |
10735 |
070104 | RCC (1:2:4),Brick,L/S.Sand-Dropwa | cum | 9263.00 |
11366 |
070201 | RCC (1:2:4),Stone,Syl.Sand-Footin | cum | 11979.00 |
14699 |
070202 | RCC (1:2:4)-Stone-Column,Wall-GF | cum | 12300.00 |
15092 |
070203 | RCC (1:2:4)-Stone,S.sand-Slab-GF | cum | 12107.00 |
14856 |
070204 | RCC (1:2:4)-Stone-Drop wall-GF | cum | 12621.00 |
15486 |
070301 | RCC (1:1.5:3),Stone,S.Sand-Footin | cum | 12451.00 |
15278 |
070302 | RCC (1:1.5:3)-Column,Lift Wall-GF | cum | 12772.00 |
15672 |
070303 | RCC (1:1.5:3)-Slab, Lintel-GF | cum | 12580.00 |
15436 |
070304 | RCC (1:1.5:3)-Drop wall-GF | cum | 13094.00 |
16067 |
070401 | RCC (1:1.25:2.5),Stone-Footin | cum | 12857.00 |
15776 |
070402 | RCC (1:1.25:2.5)-Column, Wall-GF | cum | 13178.00 |
16170 |
070403 | RCC (1:1.25:2.5)-Slab-GF | cum | 12985.00 |
15933 |
070404 | RCC (1:1.25:2.5)-Drop wall-GF | cum | 13499.00 |
16564 |
070501 | RCC (1:1:2)-Footing, cap, raft | cum | 13483.00 |
16544 |
070502 | RCC (1:1:2)-Column, Wall- GF | cum | 13804.00 |
16938 |
070601 | Fair-face concrete (1:1.5:3)-Colm | cum | 15142.00 |
18580 |
070701 | Batching Plant RCC-25Mpa-upto 4th | cum | 13349.00 |
16380 |
070702 | Batching Plant RCC-32Mpa-upto 4th | cum | 13819.00 |
16956 |
070703 | Batching Plant RCC-40Mpa-upto 4th | cum | 14196.00 |
17419 |
070704 | Batching Plant RCC-50Mpa-upto 4th | cum | 16202.00 |
19880 |
070801 | Ready Mix RCC-25Mpa-Found to 4th | cum | 12759.00 |
15656 |
070802 | Ready Mix RCC-32Mpa-Found to 4th | cum | 13229.00 |
16232 |
070803 | Ready Mix RCC-40Mpa-Found to 4th | cum | 13606.00 |
16695 |
070804 | Ready Mix RCC-50Mpa-Found to 4th | cum | 15611.00 |
19155 |
070805 | Ready Mix RCC-25Mpa-with PCC-Mat | cum | 12766.00 |
15664 |
070806 | Ready Mix RCC-32Mpa-with PCC-Mat | cum | 13229.00 |
16232 |
070901 | RCC-30Mpa-Saline Zone-Footing, GB | cum | 13404.00 |
16447 |
070902 | RCC-30Mpa-Saline Zone-Column,Wall | cum | 13725.00 |
16841 |
070903 | RCC-30Mpa-Saline Zone-Beam Slab | cum | 13232.00 |
16236 |
070904 | RCC-30Mpa-Saline Zone-Drop Wall | cum | 13745.00 |
16865 |
0710 | RCC-Extra meter over 4m | cum | 313.00 |
384 |
071101 | RCC-Mixer m/c-Additional Floor | cum | 83.00 |
102 |
0711021 | RCC-RMC-with pump-5th-14th Floor | cum | 15.00 |
18 |
0711022 | RCC-RMC-with pump-above15th Floor | cum | 38.00 |
47 |
071201 | Formwork (Steel)-Footing | sqm | 472.00 |
579 |
071202 | Formwork (Steel)-Mat/ Raft | sqm | 476.00 |
584 |
071203 | Formwork (Steel)-Foundation Beam | sqm | 406.00 |
498 |
071204 | Formwork (Steel)-Column, Wall- GF | sqm | 423.00 |
519 |
071205 | Formwork (Steel)-TB, Lintel- GF | sqm | 440.00 |
540 |
071206 | Formwork (Steel)-Beam- GF | sqm | 459.00 |
563 |
071207 | Formwork (Steel)-Slab- GF | sqm | 486.00 |
596 |
071208 | Formwork (Steel)-Drop wall- GF | sqm | 394.00 |
483 |
071209 | Formwork (Steel)-Sunshade- GF | sqm | 438.00 |
537 |
071210 | Formwork (Steel)-Stair- GF | sqm | 446.00 |
547 |
071211 | Formwork (Steel)-Waffle- GF | sqm | 576.00 |
707 |
0712121 | Formwork (Steel)-Arch-8m-use Sing | sqm | 1747.00 |
2144 |
0712122 | Formwork (Steel)-Arch-8m-use 2tim | sqm | 1223.00 |
1501 |
0712123 | Formwork (Steel)-Arch-8m-use 3tim | sqm | 874.00 |
1072 |
0712124 | Formwork (Steel)-Arch-8m-use>3tim | sqm | 612.00 |
751 |
0713 | Formwork (Steel)-Arch >8m-AddRat | sqm | 437.00 |
536 |
0714 | Formwork (Steel)-Extra for Circul | sqm | 94.00 |
115 |
0715 | Shutter-Steel-Beam-Extra m over4 | sqm | 46.00 |
56 |
0716 | Shutter-Add for each floor | sqm | 16.00 |
20 |
0717 | Formwork-Fare Face Concrete Surfa | sqm | 904.00 |
1109 |
071801 | Formwork (Wood) - Footing | sqm | 426.00 |
523 |
071802 | Formwork (Wood) - Foundation Beam | sqm | 387.00 |
475 |
071803 | Formwork (Wood) - Padestal/ Wall | sqm | 424.00 |
520 |
071804 | Formwork (Wood)-Tie Beam/ Lintel | sqm | 430.00 |
528 |
071805 | Formwork (Wood) - Beam | sqm | 421.00 |
517 |
071806 | Formwork (Wood) - Slab | sqm | 472.00 |
579 |
071807 | Formwork (Wood) - Drop wall | sqm | 374.00 |
459 |
071808 | Formwork (Wood) - Sunshade | sqm | 449.00 |
551 |
071809 | Formwork (Wood) - Stair | sqm | 431.00 |
529 |
071901 | Concrete Admix-water reduce-Typ-A | litr | 168.00 |
206 |
071902 | Concrete Admixtur-retarding-Typ-B | litr | 170.00 |
209 |
071903 | Concrete Admixtur-accelerat-Typ-C | litr | 120.00 |
147 |
071904 | Concrete Admix-reduc-returd-Typ-D | litr | 220.00 |
270 |
071905 | Concrete Admix-reduc-accele-Typ-E | litr | 190.00 |
233 |
071906 | Concrete Admix-reducer high-Typ-F | litr | 220.00 |
270 |
071907 | Concrete Admix-retarde high-Typ-G | litr | 165.00 |
202 |
072001 | Water proofing membrane on wall | sqm | 904.00 |
1109 |
072002 | Water proof membrane floor-tempo | sqm | 740.00 |
908 |
072003 | Water proof membrane floor-perma | sqm | 769.00 |
944 |
0721 | Polymer based Curing Compound | sqm | 183.00 |
225 |
0722 | Epoxy Bonding Agent | sqm | 897.00 |
1101 |
0723 | Salt Guard Coating | sqm | 427.00 |
524 |
0724 | Celulloid Paper-Fair Face Formwor | sqm | 183.00 |
225 |