PWD RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=7.5%
03 BRICK SOLING, CC, DPC ETC.
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
030101 One Layer Brick Flat Soling sqm
500.00
614
030102 One Layer SCSB Flat Soling sqm
495.00
607
030201 One Layer Herring Bone Bond (HBB) sqm
777.00
953
030202 One Layer HBB SCSB sqm
829.00
1017
030301 Brick on End Edging metr
118.00
145
030302 Brick (m/c made) on End Edging metr
114.00
140
030303 Brick (SCSB) on End Edging metr
126.00
155
030401 CC (1:3:6)-L.Sand,Brickchip-Found cum
7694.00
9441
030402 CC (1:3:6)-L.Sand,Brickchip-Floor cum
7645.00
9381
030501 CC (1:2:4)-L.Sand,Brickchip-Found cum
8776.00
10768
030502 CC (1:2:4)-L.Sand,Brickchip-Floor cum
8774.00
10766
030601 DPC (1:1.5:3)-Sylhet sand,Stone sqm
1360.00
1669
030602 DPC (1:1.5:3)-Syl.sand,Ston,Admix cum
13890.00
17043
0307 Single Layer Polythene Sheet sqm
39.00
48