PWD RATE SCHEDULE-2022 Updating.. | ||||
---|---|---|---|---|
Click on Code to see the analysis or Go Home | Profit=10%, Overhead=3.5%, VAT=5.5% | |||
03 | BRICK SOLING, CC, DPC ETC. | |||
Code | Item | Unit | Cost(Tk.) | Unit Rate(Tk.) |
030101 | One Layer Brick Flat Soling | sqm | 500.00 |
601 |
030102 | One Layer SCSB Flat Soling | sqm | 495.00 |
595 |
030201 | One Layer Herring Bone Bond (HBB) | sqm | 777.00 |
933 |
030202 | One Layer HBB SCSB | sqm | 829.00 |
996 |
030301 | Brick on End Edging | metr | 118.00 |
142 |
030302 | Brick (m/c made) on End Edging | metr | 114.00 |
137 |
030303 | Brick (SCSB) on End Edging | metr | 126.00 |
151 |
030401 | CC (1:3:6)-L.Sand,Brickchip-Found | cum | 7694.00 |
9241 |
030402 | CC (1:3:6)-L.Sand,Brickchip-Floor | cum | 7645.00 |
9182 |
030501 | CC (1:2:4)-L.Sand,Brickchip-Found | cum | 8776.00 |
10540 |
030502 | CC (1:2:4)-L.Sand,Brickchip-Floor | cum | 8774.00 |
10538 |
030601 | DPC (1:1.5:3)-Sylhet sand,Stone | sqm | 1360.00 |
1633 |
030602 | DPC (1:1.5:3)-Syl.sand,Ston,Admix | cum | 13890.00 |
16683 |
0307 | Single Layer Polythene Sheet | sqm | 39.00 |
47 |