PWD RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
03 BRICK SOLING, CC, DPC ETC.
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
030101 One Layer Brick Flat Soling sqm
500.00
601
030102 One Layer SCSB Flat Soling sqm
495.00
595
030201 One Layer Herring Bone Bond (HBB) sqm
777.00
933
030202 One Layer HBB SCSB sqm
829.00
996
030301 Brick on End Edging metr
118.00
142
030302 Brick (m/c made) on End Edging metr
114.00
137
030303 Brick (SCSB) on End Edging metr
126.00
151
030401 CC (1:3:6)-L.Sand,Brickchip-Found cum
7694.00
9241
030402 CC (1:3:6)-L.Sand,Brickchip-Floor cum
7645.00
9182
030501 CC (1:2:4)-L.Sand,Brickchip-Found cum
8776.00
10540
030502 CC (1:2:4)-L.Sand,Brickchip-Floor cum
8774.00
10538
030601 DPC (1:1.5:3)-Sylhet sand,Stone sqm
1360.00
1633
030602 DPC (1:1.5:3)-Syl.sand,Ston,Admix cum
13890.00
16683
0307 Single Layer Polythene Sheet sqm
39.00
47