PWD RATE SCHEDULE-2022 Updating..
Click on Code to see the analysis or Go Home Profit=10%, Overhead=3.5%, VAT=5.5%
02 EXCAVATION, FILLING, SITE DEVELOPMENT AND PALASIDING
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
020101 Earthwork in Excavation-Layout sqm
18.00
22
020102 Excavate 1.5m depth 10m lead cum
152.00
183
020103 Excavat addl 0.5m exceed 1.5m dpt cum
26.00
31
020104 Excavat addl 1m beyond 10 m lead cum
4.00
5
0202 Bailing out water during excavatn hr
374.00
449
0203 Driving bamboo post 75mm dia metr
74.00
89
0204 Wooden Bollah drive in palasiding metr
517.00
621
0205 Palasiding drum sheet excl post sqm
521.00
626
0206 Hor bracing wooden bollah-1/2spl metr
190.00
228
020701 Shore protection-excavation-1.5m sqm
581.00
698
020702 Shore protection excv beyond 1.5 sqm
852.00
1023
0208 Geotextile-filled earth protectn sqm
180.00
216
0209 Remove Sludge, Sand-FM.8=1:10 cum
952.00
1143
021001 Sand Filling-F.M.=0.5 cum
909.00
1092
021002 Sand Filling-F.M.=0.8 cum
973.00
1169
021003 Sand Filling-F.M.=1.2 cum
1354.00
1626
021004 Sand Filling-F.M.=2.2 cum
2732.00
3281
0211 Khoa Consolidation-Khoa:LSand=2:1 cum
4862.00
5840
0212 Khoa Cons-Cement:sand:khoa=1:6:12 cum
5726.00
6877
0213 Earth Filling with earth availabl cum
187.00
225
0214 Clearing, disposal earth by truc cum
699.00
840
0215 Earth Filling by carted by truck cum
592.00
711
021601 Site Develop by carted by truck cum
637.00
765
021602 Site Develop by dredging cum
421.00
506
0217 Mechanical Compaction of Earth cum
193.00
232
021801 ExcavationPond-Lead 30m,lift-1.5m cum
229.00
275
021802 ExcavatPond-Addl lift 0.3m,1.5-3m cum
8.00
10
021803 ExcavatPond-Addl lift 0.3m,3-4.5m cum
12.00
14
021804 ExcavatPond-Addl lift 0.3m,4.5-6m cum
17.00
20
021805 ExcavatPnd-Addl lead-03m >30m cum
31.00
37
021901 Bail-out water-1 cusec DieselPump hour
573.00
688
021902 Bail-out water-1 cusec ElectrPump hour
486.00
584