BREAKDOWN OF UNIT PRICE
Item:3037032. AAC Block-Add each floor above GF
Basis:100cft
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Skilled Labour
0.281
No.
600.00
168.60
Sub-Total(L1)
168.60
59.54
Total(1)
59.54
Add over head on Total(1)
3.5 %
2.08
Add Profit on Total(1)
10.0 %
5.95
Total(2)
8.04
Add VAT on Unit Price
5.5 %
0.47
Unit Price
8.51
Say
9
per cum