BREAKDOWN OF UNIT PRICE |
Item:267303. Inspectn Pit-CI Cover-600x600x825 |
Basis:1no. | |
A1.Brick/ Blocks |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Brick | 436.821 | Nos. |
10.00 | |
|
|
Sub-Total(A1) |
4368.21
|
4368.21
|
A2.Cement |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Cement: CEM-II/A,52.5-PCC | 2.552 | bag |
405.00 | |
|
Cement: CEM-I, 52.5-OPC | 0.527 | bag |
440.00 | |
|
|
Sub-Total(A2) |
1265.44
|
1265.44
|
A4.Earth/ Sand |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Sand (FM=0.8) | 0.674 | cft |
16.70 | |
|
Sand (F.M.1.2) | 13.392 | cft |
19.00 | |
|
Sand (F.M.2.2) | 0.659 | cft |
53.80 | |
|
|
Sub-Total(A4) |
301.16
|
301.16
|
B1.Sanitary- Water Supp |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
CI Manhole Cover-450mm D | 1.000 | no. |
910.00 | |
|
|
Sub-Total(B1) |
910.00
|
910.00
|
E1.Equipment/ Scaffoldi |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Mixer m/c hire charge | 0.003 | day |
1200.00 | |
|
Vibrator m/c hire charge | 0.006 | day |
550.00 | |
|
Fuel for mixer m/c, vibra | 0.003 | day |
1275.00 | |
|
|
Sub-Total(E1) |
10.73
|
10.73
|
F2.Steel-MS/ SS |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
MS Rod 300 grade/ 40 grad | 6.515 | kg |
65.00 | |
|
|
Sub-Total(F2) |
423.48
|
423.48
|
L1.Labour-Civil |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Ordinary Labour | 2.588 | No. |
550.00 | |
|
Mason | 0.937 | No. |
700.00 | |
|
Skilled Labour | 0.767 | No. |
600.00 | |
|
Head Mason | 0.143 | No. |
800.00 | |
|
Plumber | 0.140 | No. |
700.00 | |
|
|
Sub-Total(L1) |
2751.90
|
2751.90
|
L2.Work Rate-1 |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Breaking 20mm brick-chips | 6.273 | cft |
9.70 | |
|
Laying/ placing concrete | 4.040 | cft |
19.90 | |
|
|
Sub-Total(L2) |
141.24
|
141.24
|
M1.Miscelleneous |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Curing for 7 days | 0.040 | LS |
229.17 | |
|
|
Sub-Total(M1) |
9.17
|
9.17
|
M2.Local Carriage,Sundr |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Local Carriage-(Labour) | 0.445 | No. |
550.00 | |
|
|
Sub-Total(M2) |
244.75
|
244.75
|
|
|
|
Total(1) |
|
10426.07 |
|
Add over head on Total(1)
|
3.5 % |
364.91 |
|
Add Profit on Total(1) |
10.0 % |
1042.61
|
|
|
|
Total(2) |
|
1407.52 |
|
Add VAT on Unit Price |
5.5 % |
81.92 |
|
|
|
Unit Price |
|
1489.44
|
|
|
|
Say |
1489 |
per each |