BREAKDOWN OF UNIT PRICE
Item:267302. Inspectn Pit-CI Cover-525x525x750
Basis:1no.
A1.Brick/ Blocks
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Brick
316.372
Nos.
10.00
3163.72
Sub-Total(A1)
3163.72
3163.72
A2.Cement
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement: CEM-II/A,52.5-PCC
1.899
bag
405.00
769.10
Cement: CEM-I, 52.5-OPC
0.446
bag
440.00
196.24
Sub-Total(A2)
965.34
965.34
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (FM=0.8)
0.585
cft
16.70
9.77
Sand (F.M.1.2)
9.806
cft
19.00
186.31
Sand (F.M.2.2)
0.558
cft
53.80
30.02
Sub-Total(A4)
226.10
226.10
B1.Sanitary- Water Supp
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
CI Manhole Cover-450mm D
1.000
no.
910.00
910.00
Sub-Total(B1)
910.00
910.00
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mixer m/c hire charge
0.002
day
1200.00
2.40
Vibrator m/c hire charge
0.005
day
550.00
2.75
Fuel for mixer m/c, vibra
0.002
day
1275.00
2.55
Sub-Total(E1)
7.70
7.70
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Rod 300 grade/ 40 grad
5.513
kg
65.00
358.35
Sub-Total(F2)
358.35
358.35
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ordinary Labour
1.939
No.
550.00
1066.45
Mason
0.707
No.
700.00
494.90
Skilled Labour
0.602
No.
600.00
361.20
Head Mason
0.109
No.
800.00
87.20
Plumber
0.125
No.
700.00
87.50
Sub-Total(L1)
2097.25
2097.25
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Breaking 20mm brick-chips
5.319
cft
9.70
51.59
Laying/ placing concrete
3.430
cft
19.90
68.26
Sub-Total(L2)
119.85
119.85
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Curing for 7 days
0.034
LS
229.17
7.79
Sub-Total(M1)
7.79
7.79
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.335
No.
550.00
184.25
Sub-Total(M2)
184.25
184.25
Total(1)
8040.35
Add over head on Total(1)
3.5 %
281.41
Add Profit on Total(1)
10.0 %
804.03
Total(2)
1085.45
Add VAT on Unit Price
5.5 %
63.17
Unit Price
1148.62
Say
1149
per each