BREAKDOWN OF UNIT PRICE
Item:2421. Expansion Joint in RCC Road
Basis:10rft
A3.Stone/ Mosaic/ Admix
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Bitumen (60/70 grade)
2.993
kg
56.00
167.61
Sub-Total(A3)
167.61
54.99
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (F.M.2.2)
0.208
cft
53.80
11.19
Sub-Total(A4)
11.19
3.67
B3.PVC Pipe-Electrical
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
PVC Pipe-19mm
4.000
rft
6.50
26.00
Sub-Total(B3)
26.00
8.53
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Rod-fy=400Mpa,Cold drw
2.553
kg
72.00
183.82
Sub-Total(F2)
183.82
60.31
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ordinary Labour
0.250
No.
550.00
137.50
Rod Binder
0.250
No.
700.00
175.00
Helper
0.500
No.
550.00
275.00
Sub-Total(L1)
587.50
192.76
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Greese
0.384
kg
143.26
55.01
Sub-Total(M1)
55.01
18.05
Total(1)
338.31
Add over head on Total(1)
3.5 %
11.84
Add Profit on Total(1)
10.0 %
33.83
Total(2)
383.98
Add VAT on Unit Price
7.5 %
31.13
Unit Price
415.12
Say
415
per metr