BREAKDOWN OF UNIT PRICE
Item:222402. RCC Pipe-300mm dia
Basis:18rft
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (FM=0.8)
25.000
cft
16.70
417.50
Sub-Total(A4)
417.50
76.10
B8.RCC Pipe
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
RCC Pipe-300mm dia
18.000
rft
460.00
8280.00
Sub-Total(B8)
8280.00
1509.26
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mason
0.250
No.
700.00
175.00
Skilled Labour
0.750
No.
600.00
450.00
Sub-Total(L1)
625.00
113.92
L3.Work Rate i/c Materi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement Concrete(1:3:6)
4.820
cft
178.37
859.74
Sub-Total(L3)
859.74
156.71
Total(1)
1856.00
Add over head on Total(1)
3.5 %
64.96
Add Profit on Total(1)
10.0 %
185.60
Total(2)
250.56
Add VAT on Unit Price
5.5 %
14.58
Unit Price
265.14
Say
265
per metr