BREAKDOWN OF UNIT PRICE
Item:201403. SS Ver Railing- 62mm Hand-75x75
Basis:46sft
B7.GI/ SS Pipe/ Fitting
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
SS Pipe-D=62mm, t=2mm
13.650
rft
285.00
3890.25
SS Pipe-D=25mm, t=1.5mm
109.200
rft
100.00
10920.00
SS Bend-62mm dia
2.000
Pcs
73.00
146.00
SS End socket-62mm dia
2.000
Pcs
36.00
72.00
SS End cap-25x25mm
16.000
nos.
15.00
240.00
SS Box-75x75mm, t=2 Post
5.000
nos
2000.00
10000.00
SS Knob
40.000
nos.
100.00
4000.00
SS Plate-150x150x6
5.000
nos.
250.00
1250.00
Sub-Total(B7)
30518.25
7219.75
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
SS Railing workshop charg
1.000
LS
1500.00
1500.00
Sub-Total(E1)
1500.00
354.86
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ordinary Labour
2.500
No.
550.00
1375.00
Helper
2.000
No.
550.00
1100.00
Welder/ Fabricator
1.250
No.
700.00
875.00
Sub-Total(L1)
3350.00
792.51
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Rowel Bolt
20.000
Nos
57.00
1140.00
Welding Rod (Electrode)
120.000
Nos
10.00
1200.00
SS Railing Poilising
32858.300
perc
0.10
3285.83
Sub-Total(M1)
5625.83
1330.91
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.636
No.
550.00
349.80
Sub-Total(M2)
349.80
82.75
Total(1)
9780.78
Add over head on Total(1)
3.5 %
342.33
Add Profit on Total(1)
10.0 %
978.08
Total(2)
1320.41
Add VAT on Unit Price
5.5 %
76.85
Unit Price
1397.25
Say
1397
per sqm