BREAKDOWN OF UNIT PRICE
Item:180403. MS Fixed Louver
Basis:13sft
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Louver-Workshop charge
1.000
LS
3000.00
3000.00
Sub-Total(E1)
3000.00
2583.36
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Flat (FI) Bar
1.510
kg
70.00
105.70
MS Sheet
32.800
kg
77.00
2525.60
MS Angle
11.300
kg
70.00
791.00
Sub-Total(F2)
3422.30
2947.01
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Louver-fixing, scaffod
1.000
LS
700.00
700.00
Sub-Total(L2)
700.00
602.78
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
1.818
No.
550.00
999.90
Sub-Total(M2)
999.90
861.03
Total(1)
6994.19
Add over head on Total(1)
3.5 %
244.80
Add Profit on Total(1)
10.0 %
699.42
Total(2)
944.22
Add VAT on Unit Price
5.5 %
54.95
Unit Price
999.17
Say
999
per sqm