BREAKDOWN OF UNIT PRICE
Item:180104. Fire Rated Gypsum Board Ceiling
Basis:100sft
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Scaffolding
30.000
sft
10.00
300.00
Sub-Total(E1)
300.00
32.29
F1.Timber/ Board
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Firerated Gypsum Brd-12mm
105.000
sft
50.00
5250.00
Sub-Total(F1)
5250.00
565.11
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
U bar/Furing chanel-38x12
239.400
rft
23.00
5506.20
GI Angle-19x19x0.5
42.000
rft
26.00
1092.00
Sub-Total(F2)
6598.20
710.23
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ordinary Labour
6.000
No.
550.00
3300.00
Skilled Labour
3.000
No.
600.00
1800.00
Alum.Skilled Technicians
1.500
No.
1200.00
1800.00
Sub-Total(L1)
6900.00
742.72
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Rowel Plug -False Ceiling
1.322
LS
1041.20
1376.47
Sub-Total(M1)
1376.47
148.16
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.909
No.
550.00
499.95
Sub-Total(M2)
499.95
53.81
Total(1)
2252.33
Add over head on Total(1)
3.5 %
78.83
Add Profit on Total(1)
10.0 %
225.23
Total(2)
304.06
Add VAT on Unit Price
5.5 %
17.70
Unit Price
321.76
Say
322
per sqm