Return Main Menu
BREAKDOWN OF UNIT PRICE
Item:1312. MS Grill Door-25mm Rod@75mm c/c
Basis:23sft
B7.GI/ SS Pipe/ Fitting
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
G.I. Pipe-40 mm dia
3.150
rft
175.00
551.25
Sub-Total(B7)
551.25
254.55
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Flat (FI) Bar
0.955
kg
70.00
66.85
MS Rod 300 grade/ 40 grad
98.239
kg
65.00
6385.54
MS Angle/ Z section
118.545
kg
70.00
8298.15
MS Plate-Grade 345
23.647
kg
77.00
1820.82
Sub-Total(F2)
16571.35
7652.25
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mason
1.000
No.
700.00
700.00
Helper
1.000
No.
550.00
550.00
Sub-Total(L1)
1250.00
577.22
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Grill Rod/ FI Bar Fabrica
23.310
sft
51.00
1188.81
Sub-Total(L2)
1188.81
548.96
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
CC, Curing-Grill
2.710
LS
150.00
406.50
Sub-Total(M1)
406.50
187.71
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.909
No.
550.00
499.95
Sub-Total(M2)
499.95
230.86
Total(1)
9451.57
Add over head on Total(1)
3.5 %
330.80
Add Profit on Total(1)
10.0 %
945.16
Total(2)
1275.96
Add VAT on Unit Price
5.5 %
74.26
Unit Price
1350.22
Say
1350
per sqm