BREAKDOWN OF UNIT PRICE
Item:1306. Ver Grill -10mm Rod 100mm c/c
Basis:32sft
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Flat (FI) Bar
2.318
kg
70.00
162.26
MS Rod 300 grade/ 40 grad
32.230
kg
65.00
2094.95
MS Angle/ Z section
17.032
kg
70.00
1192.24
Sub-Total(F2)
3449.45
1160.31
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mason
0.500
No.
700.00
350.00
Helper
0.500
No.
550.00
275.00
Sub-Total(L1)
625.00
210.23
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Grill Rod/ FI Bar Fabrica
32.000
sft
51.00
1632.00
Sub-Total(L2)
1632.00
548.96
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
CC, Curing-Grill
1.000
LS
150.00
150.00
Sub-Total(M1)
150.00
50.46
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.250
No.
550.00
137.50
Sub-Total(M2)
137.50
46.25
Total(1)
2016.21
Add over head on Total(1)
3.5 %
70.57
Add Profit on Total(1)
10.0 %
201.62
Total(2)
272.19
Add VAT on Unit Price
5.5 %
15.84
Unit Price
288.03
Say
288
per sqm