Return Main Menu
BREAKDOWN OF UNIT PRICE
Item:110302. MS Angle Door Frame - Single Leaf
Basis:17rft
A1.Brick/ Blocks
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Brick
3.978
Nos.
10.00
39.78
Sub-Total(A1)
39.78
7.68
A2.Cement
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement: CEM-I, 52.5-OPC
0.094
bag
440.00
41.36
Sub-Total(A2)
41.36
7.98
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (F.M.1.2)
0.117
cft
19.00
2.22
Sand (F.M.2.2)
0.117
cft
53.80
6.29
Sub-Total(A4)
8.52
1.64
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Angle/ Z section
21.805
kg
70.00
1526.35
Sub-Total(F2)
1526.35
294.59
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ordinary Labour
0.012
No.
550.00
6.60
Mason
0.001
No.
700.00
0.70
Skilled Labour
0.003
No.
600.00
1.80
Head Mason
0.001
No.
800.00
0.80
Sub-Total(L1)
9.90
1.91
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Breaking 20mm brick-chips
0.468
cft
9.70
4.54
Fabricating Angle
21.805
kg
7.19
156.78
Fixing MS Angle door fram
1.000
No.
408.33
408.33
Sub-Total(L2)
569.65
109.94
L3.Work Rate i/c Materi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Joint Welding
80.000
inch
5.00
400.00
Sub-Total(L3)
400.00
77.20
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Iron Hinge-100mm
4.000
Nos.
49.00
196.00
Sub-Total(M1)
196.00
37.83
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.300
No.
550.00
165.00
Sub-Total(M2)
165.00
31.85
Total(1)
570.62
Add over head on Total(1)
3.5 %
19.97
Add Profit on Total(1)
10.0 %
57.06
Total(2)
77.03
Add VAT on Unit Price
5.5 %
4.48
Unit Price
81.52
Say
82
per rm