BREAKDOWN OF UNIT PRICE
Item:1009. Build-up Steel Bracing-250 Mpa
Basis:1000kg.
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Plate-250 MPa
1020.000
kg
77.00
78540.00
Less Salvage MS Plate-60%
1020.000
kg
-44.40
-45288.00
Sub-Total(F2)
33252.00
33252.00
F4.Paint
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Red oxide primer
12.000
litr
180.00
2160.00
Sub-Total(F4)
2160.00
2160.00
F5.Polish
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Wood Varnish Thinner
4.000
litr
131.00
524.00
Sub-Total(F5)
524.00
524.00
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Red oxide primer apply
1000.000
kg
0.60
600.00
Steel Bracing Erection-De
1000.000
kg
16.00
16000.00
Sub-Total(L2)
16600.00
16600.00
L3.Work Rate i/c Materi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Steel Shore Pile Fabricat
1000.000
kg
20.00
20000.00
Sub-Total(L3)
20000.00
20000.00
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-Load-Unloa
1000.000
kg
1.70
1700.00
Sub-Total(M2)
1700.00
1700.00
Total(1)
74236.00
Add over head on Total(1)
3.5 %
2598.26
Add Profit on Total(1)
10.0 %
7423.60
Total(2)
10021.86
Add VAT on Unit Price
5.5 %
583.28
Unit Price
10605.14
Say
10605
per ton