BREAKDOWN OF UNIT PRICE
Item:0912. Precast Pile Shuttering
Basis:400sft
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Sheet-use 16 times
396.886
kg
4.80
1905.05
MS Angle-use 16 times
1059.659
kg
4.37
4630.71
FI Bar-use 16 times
80.305
kg
4.37
350.93
Nut-bolt-use 16 times
20.000
kg
10.00
200.00
Sub-Total(F2)
7086.70
190.70
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Make steel shutter-use 16
400.000
sft
5.63
2252.00
Fixing Precast pile shutt
400.000
sft
12.00
4800.00
Sub-Total(L2)
7052.00
189.77
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Hessain for water-tight
400.000
sft
1.50
600.00
Curing for 28 days
400.000
sft
4.58
1832.00
Sub-Total(M1)
2432.00
65.45
Total(1)
445.92
Add over head on Total(1)
3.5 %
15.61
Add Profit on Total(1)
10.0 %
44.59
Total(2)
60.20
Add VAT on Unit Price
5.5 %
3.50
Unit Price
63.70
Say
64
per sqm