BREAKDOWN OF UNIT PRICE |
Item:0908071. Static Load Test-250 ton-1st test |
Basis:1no. | |
A4.Earth/ Sand |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Sand (FM=0.8) | 2278.500 | cft |
16.70 | |
|
|
Sub-Total(A4) |
38050.95
|
38050.95
|
E1.Equipment/ Scaffoldi |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Hire Load Test Equip>200t | 1.000 | no. |
9000.00 | |
|
|
Sub-Total(E1) |
9000.00
|
9000.00
|
L1.Labour-Civil |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Ordinary Labour | 14.000 | No. |
550.00 | |
|
Skilled Labour | 7.000 | No. |
600.00 | |
|
Foreman/ Supervisor | 2.000 | No. |
850.00 | |
|
|
Sub-Total(L1) |
13600.00
|
13600.00
|
L2.Work Rate-1 |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Load-test platform making | 250.000 | ton |
275.00 | |
|
Fill,stich,load,unload | 9114.000 | bag |
12.00 | |
|
|
Sub-Total(L2) |
178118.00
|
178118.00
|
M1.Miscelleneous |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Empty Gunny bag-use 2 tim | 4557.000 | bag |
5.00 | |
|
Load test result preparat | 1.000 | test |
6500.00 | |
|
|
Sub-Total(M1) |
29285.00
|
29285.00
|
M2.Local Carriage,Sundr |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
Local Carriage-(Labour) | 2.000 | No. |
550.00 | |
|
|
Sub-Total(M2) |
1100.00
|
1100.00
|
|
|
|
Total(1) |
|
269153.95 |
|
Add over head on Total(1)
|
3.5 % |
9420.39 |
|
Add Profit on Total(1) |
10.0 % |
26915.40
|
|
|
|
Total(2) |
|
36335.78 |
|
Add VAT on Unit Price |
5.5 % |
2114.78 |
|
|
|
Unit Price |
|
38450.56
|
|
|
|
Say |
38451 |
per test |