BREAKDOWN OF UNIT PRICE
Item:0903. In-situ Pile Mud/ Spoisl Remove
Basis:200cft
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Hire charge-Mud Pump-3 HP
0.250
day
645.00
161.25
MS Steel Tank-1950x3000x
1.000
trip
350.00
350.00
Hire charge of truck
1.000
trip
2300.00
2300.00
Sub-Total(E1)
2811.25
496.40
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ordinary Labour
0.500
No.
550.00
275.00
Machine operator
0.250
No.
650.00
162.50
Sub-Total(L1)
437.50
77.25
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.313
No.
550.00
172.15
Sub-Total(M2)
172.15
30.40
Total(1)
604.05
Add over head on Total(1)
3.5 %
21.14
Add Profit on Total(1)
10.0 %
60.40
Total(2)
81.55
Add VAT on Unit Price
5.5 %
4.75
Unit Price
86.29
Say
86
per cum