BREAKDOWN OF UNIT PRICE
Item:090101. In-situ Pile Boring - 400 mm dia
Basis:92rft
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
In-situ piling rig-hire
1.000
day
8500.00
8500.00
Sub-Total(E1)
8500.00
303.57
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ordinary Labour
6.000
No.
550.00
3300.00
Skilled Labour
3.000
No.
600.00
1800.00
Foreman/ Supervisor
1.000
No.
850.00
850.00
Sub-Total(L1)
5950.00
212.50
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Bentoniote
105.558
kg
36.00
3800.09
Power, water,clean,sundry
1.000
LS
429.69
429.69
Sub-Total(M1)
4229.78
151.06
Total(1)
667.13
Add over head on Total(1)
3.5 %
23.35
Add Profit on Total(1)
10.0 %
66.71
Total(2)
90.06
Add VAT on Unit Price
5.5 %
5.24
Unit Price
95.30
Say
95
per metr