BREAKDOWN OF UNIT PRICE
Item:0806. Alum Water stopper-RCC vertical
Basis:20rft
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mason
0.200
No.
700.00
140.00
Skilled Labour
0.200
No.
600.00
120.00
Sub-Total(L1)
260.00
42.65
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Nail and wires, gazals
0.417
kg
70.00
29.19
16 BWG Aluminium sheet
3.770
kg
405.00
1526.85
Sub-Total(M1)
1556.04
255.27
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.083
No.
550.00
45.65
Sub-Total(M2)
45.65
7.49
Total(1)
305.41
Add over head on Total(1)
3.5 %
10.69
Add Profit on Total(1)
10.0 %
30.54
Total(2)
41.23
Add VAT on Unit Price
5.5 %
2.40
Unit Price
43.63
Say
44
per metr