BREAKDOWN OF UNIT PRICE
Item:071802. Formwork (Wood) - Foundation Beam
Basis:75sft
F1.Timber/ Board
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Wood for Shutter use 8-ti
9.740
cft
68.75
669.63
Sub-Total(F1)
669.63
96.10
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Wood shuttering i/c makin
75.000
sft
18.00
1350.00
Sub-Total(L2)
1350.00
193.75
L3.Work Rate i/c Materi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Making form water tight
75.000
sft
3.00
225.00
Sub-Total(L3)
225.00
32.29
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Nail and wire for shutter
75.000
sft
0.53
39.75
Curing for 28 days
90.000
sft
4.58
412.20
Sub-Total(M1)
451.95
64.86
Total(1)
387.01
Add over head on Total(1)
3.5 %
13.55
Add Profit on Total(1)
10.0 %
38.70
Total(2)
52.25
Add VAT on Unit Price
5.5 %
3.04
Unit Price
55.29
Say
55
per sqm