BREAKDOWN OF UNIT PRICE
Item:0717. Formwork-Fare Face Concrete Surfa
Basis:40sft
D1.Prop/Pipe/I-sec/Box
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Pipe-38mm-use 50 time
32.000
rft
2.70
86.40
Turn-buckle-use 50 time
4.000
Nos.
9.00
36.00
Sub-Total(D1)
122.40
32.94
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Angle use 15 times
143.536
kg
4.66
668.88
FI Bar-use 15 times
11.386
kg
4.66
53.06
MS Sheet/ Plate-use 15 ti
120.101
kg
5.12
614.92
Sub-Total(F2)
1336.85
359.75
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Fabricat Shutter-use 15t
46.670
sft
6.00
280.02
Fare Face Shuttering
40.000
sft
22.50
900.00
Extra Labor-polish shuttr
1.000
LS
225.00
225.00
Sub-Total(L2)
1405.02
378.09
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Form oil
0.372
litr
180.00
66.96
Curing for 28 days
40.000
sft
4.58
183.20
Putty for Water tight wor
0.400
kg
107.00
42.80
Nut-bolt, J-hook-use 15 t
1.500
kg
10.67
16.01
Mlamine board,foam,peakon
1.000
LS
185.80
185.80
Sub-Total(M1)
494.77
133.14
Total(1)
903.92
Add over head on Total(1)
3.5 %
31.64
Add Profit on Total(1)
10.0 %
90.39
Total(2)
122.03
Add VAT on Unit Price
5.5 %
7.10
Unit Price
129.13
Say
129
per sqm