BREAKDOWN OF UNIT PRICE
Item:0715. Shutter-Steel-Beam-Extra m over4
Basis:800sft
D1.Prop/Pipe/I-sec/Box
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Pipe-38mm-use 50 time
70.000
rft
2.70
189.00
MS Pipe-50mm-use 50 times
70.000
rft
3.24
226.80
Adjust. Baseplate-use 50
10.000
No.
12.48
124.80
Sub-Total(D1)
540.60
7.27
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Angle use 30 times
124.714
kg
2.33
290.58
FI Bar-use 30 times
48.036
kg
2.33
111.92
MS Sheet/ Plate-use 30 ti
100.850
kg
2.56
258.18
Sub-Total(F2)
660.68
8.89
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Fabricat Shutter-use 30t
86.600
sft
3.00
259.80
Fitting-steel shutter
80.000
sft
18.00
1440.00
Sub-Total(L2)
1699.80
22.87
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Nut-bolt, J-hook-use 30 t
4.000
kg
5.33
21.32
Hessain for water-tight
80.000
sft
1.50
120.00
Curing for 28 days
80.000
sft
4.58
366.40
Sub-Total(M1)
507.72
6.83
Total(1)
45.87
Add over head on Total(1)
3.5 %
1.61
Add Profit on Total(1)
10.0 %
4.59
Total(2)
6.19
Add VAT on Unit Price
5.5 %
0.36
Unit Price
6.55
Say
7
per sqm