BREAKDOWN OF UNIT PRICE
Item:071207. Formwork (Steel)-Slab- GF
Basis:350sft
D1.Prop/Pipe/I-sec/Box
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Pipe-38mm-use 50 time
441.000
rft
2.70
1190.70
MS Pipe-50mm-use 50 times
567.000
rft
3.24
1837.08
Adjust. Baseplate-use 50
63.000
No.
12.48
786.24
Steel Box-100x50 use 50ti
497.000
rft
4.52
2246.44
Sub-Total(D1)
6060.46
186.39
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Angle use 30 times
28.886
kg
2.33
67.30
FI Bar-use 30 times
9.332
kg
2.33
21.74
MS Sheet/ Plate-use 30 ti
407.759
kg
2.56
1043.86
Sub-Total(F2)
1132.91
34.84
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Fabricat Shutter-use 30t
30.140
sft
3.00
90.42
Fitting-steel shutter
350.000
sft
18.00
6300.00
Repair, mainenanc shutter
350.000
sft
0.08
28.00
Sub-Total(L2)
6418.42
197.39
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Nut-bolt, J-hook-use 30 t
12.000
kg
5.33
63.96
Hessain for water-tight
350.000
sft
1.50
525.00
Curing for 28 days
350.000
sft
4.58
1603.00
Sub-Total(M1)
2191.96
67.41
Total(1)
486.03
Add over head on Total(1)
3.5 %
17.01
Add Profit on Total(1)
10.0 %
48.60
Total(2)
65.61
Add VAT on Unit Price
5.5 %
3.82
Unit Price
69.43
Say
69
per sqm