BREAKDOWN OF UNIT PRICE
Item:071206. Formwork (Steel)-Beam- GF
Basis:80sft
D1.Prop/Pipe/I-sec/Box
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Pipe-38mm-use 50 time
70.000
rft
2.70
189.00
MS Pipe-50mm-use 50 times
70.000
rft
3.24
226.80
Adjust. Baseplate-use 50
10.000
No.
12.48
124.80
Sub-Total(D1)
540.60
72.74
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Angle use 30 times
124.714
kg
2.33
290.58
FI Bar-use 30 times
48.036
kg
2.33
111.92
MS Sheet/ Plate-use 30 ti
100.850
kg
2.56
258.18
Sub-Total(F2)
660.68
88.89
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Fabricat Shutter-use 30t
86.600
sft
3.00
259.80
Fitting-steel shutter
80.000
sft
18.00
1440.00
Sub-Total(L2)
1699.80
228.71
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Nut-bolt, J-hook-use 30 t
4.000
kg
5.33
21.32
Hessain for water-tight
80.000
sft
1.50
120.00
Curing for 28 days
80.000
sft
4.58
366.40
Sub-Total(M1)
507.72
68.31
Total(1)
458.65
Add over head on Total(1)
3.5 %
16.05
Add Profit on Total(1)
10.0 %
45.87
Total(2)
61.92
Add VAT on Unit Price
5.5 %
3.60
Unit Price
65.52
Say
66
per sqm